AECDAILY PS EN 59109 1224:2024 Edition
$50.05
Pre-Engineered Steel Stair Systems
Published By | Publication Date | Number of Pages |
AECDAILY | 2024 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Slide 1 |
2 | Slide 2: Pre-Engineered Steel Stair Systems |
3 | Slide 3 |
4 | Slide 4: How to Use This Online Learning Course |
5 | Slide 5: Purpose and Learning Objectives |
6 | Slide 6: Contents |
7 | Slide 7: Advantages of Metal Stair Systems |
8 | Slide 8: Introduction |
9 | Slide 9: Advantages of Steel Stair Systems |
10 | Slide 10: Design Versatility |
11 | Slide 11: High Strength-to-Mass & Strength-to-Weight Ratios |
12 | Slide 12: Accurate Dimensional & Quality Control |
13 | Slide 13: Integral Railing Construction |
14 | Slide 14: Early Availability |
15 | Slide 15: Rapid Installation |
16 | Slide 16: Economy |
17 | Slide 17: Salvage Value |
18 | Slide 18: Review Question |
19 | Slide 19: Answer |
20 | Slide 20: Stair Class and Stair Type |
21 | Slide 21: Stair Class Designations |
22 | Slide 22: Industrial Class |
23 | Slide 23: Service Class |
24 | Slide 24: Commercial Class |
25 | Slide 25: Architectural Class |
26 | Slide 26: Use of the Stair Classification System |
27 | Slide 27: Straight Run Stairs |
28 | Slide 28: Straight Run-Parallel Stairs |
29 | Slide 29: Straight Run-Angled Stairs |
30 | Slide 30: Straight Run-Scissor Stairs |
31 | Slide 31: Circular Stairs |
32 | Slide 32: Curved Stairs |
33 | Slide 33: Spiral Stairs |
34 | Slide 34: Winder Stairs |
35 | Slide 35: Preassembled & Pre-Erected Stairs |
36 | Slide 36: General Egress Stairs |
37 | Slide 37: Review Question |
38 | Slide 38: Answer |
39 | Slide 39: Egress Railings |
40 | Slide 40: Egress Railings |
41 | Slide 41: Steel Preparation |
42 | Slide 42: Association for Materials Protection and Performance (AMPP) |
43 | Slide 43: Association for Materials Protection and Performance (AMPP) |
44 | Slide 44: Association for Materials Protection and Performance (AMPP) |
45 | Slide 45: Cleaning Preparation for Egress Stair Components |
46 | Slide 46: Multiline Rails: Manufactured vs. Fabricated |
47 | Slide 47: Multiline Rails: Cost |
48 | Slide 48: Picket Style Rails: Manufactured vs. Fabricated |
49 | Slide 49: Picket Style Rails: Cost |
50 | Slide 50: Manufactured Panel Rails |
51 | Slide 51: Post Attachment |
52 | Slide 52: Railing System Joint Construction |
53 | Slide 53: Stair & Landing Construction |
54 | Slide 54: Traditional Fabrication of Stairs |
55 | Slide 55: Preassembled Stair Systems |
56 | Slide 56: Preassembled Stair Systems |
57 | Slide 57: Stair Construction |
58 | Slide 58: Stair Construction |
59 | Slide 59: Open Shaft Structures |
60 | Slide 60: Closed Shaft Structures |
61 | Slide 61: Review Question |
62 | Slide 62: Answer |
63 | Slide 63: Connections |
64 | Slide 64: Connections |
65 | Slide 65: Hanging Landing Detail |
66 | Slide 66: Column-Supported Connections |
67 | Slide 67: Connections to Concrete or CMU Shaft Walls |
68 | Slide 68: Stair Stringer Connections to a Concrete Building Structure |
69 | Slide 69: Stair Stringer Connections to a Steel Building Structure |
70 | Slide 70: Pre-Erected Stair Assembly |
71 | Slide 71: Manufacturer or Fabricator |
72 | Slide 72: Manufacturer or Fabricator |
73 | Slide 73: Manufacturer or Fabricator |
74 | Slide 74: Code Compliance |
75 | Slide 75: Code Compliance |
76 | Slide 76: Code Requirements |
77 | Slide 77: Code Requirements |
78 | Slide 78: Code Requirements |
79 | Slide 79: Code Requirements |
80 | Slide 80: Designing an Egress System |
81 | Slide 81: Means of Egress |
82 | Slide 82: Making It Wide Enough: Exit Width |
83 | Slide 83: Making It Wide Enough: Stairway Width |
84 | Slide 84: Egress Path Identification |
85 | Slide 85: Horizontal Travel: Exit Access |
86 | Slide 86: Areas of Refuge |
87 | Slide 87: Guards & Stair Handrails |
88 | Slide 88: Stair Safety: Design |
89 | Slide 89: Stair Safety: Visibility |
90 | Slide 90: Means of Egress Continuity |
91 | Slide 91: Means of Egress Continuity: Landings at Doors |
92 | Slide 92: Means of Egress Continuity: Stairwell Interruption Gates |
93 | Slide 93: Course Summary |
94 | Slide 94: Course Summary |
95 | Slide 95: Course Summary |
96 | Slide 96: Thank You |