BS EN 14654-2:2021
$142.49
Drain and sewer systems outside buildings. Management and control of activities – Rehabilitation
Published By | Publication Date | Number of Pages |
BSI | 2021 | 24 |
This document establishes requirements for the management and control of activities in drain and sewer systems outside buildings and specifies requirements for development and implementation of work programmes, and the selection of techniques.
This document covers the management and control of rehabilitation activities.
It is applicable to drain and sewer systems from the point where wastewater leaves a building, roof drainage system, or paved area, to the point where it is discharged into a wastewater treatment plant or receiving water body.
Drains and sewers below buildings are included provided that they do not form part of the drainage system of the building.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
6 | 1 Scope 2 Normative references 3 Terms and definitions |
8 | 4 General 5 Integrated sewer system management planning 6 Preparation of rehabilitation programme 6.1 Introduction 6.2 Review of the rehabilitation plan |
9 | 6.3 Investigation 6.4 Assessment |
10 | 6.5 Development of the programme 6.5.1 Introduction 6.5.2 Developing options |
15 | 6.5.3 Assess feasibility of solutions 6.5.4 Select optimum solution 6.5.5 Producing the programme |
16 | 7 Preparation of the project specification 7.1 Introduction 7.2 Review of the project description and project objectives 7.3 Investigation 7.4 Assessment |
17 | 7.5 Drafting the project specification 7.5.1 Introduction 7.5.2 Prepare potential solutions |
18 | 7.5.3 Assess feasibility of solutions |
19 | 7.5.4 Select optimal solution |
20 | 7.5.5 Detailed design of optimal solution 7.5.6 Prepare project specification 7.6 Performance indicators 7.6.1 Introduction 7.6.2 Indicators for the assessment of the work quality 7.6.3 Indicators for the assessment of the effectiveness of the project or programme |
21 | 8 Implementation of projects 8.1 Introduction 8.2 Rehabilitation report 9 Measurement of conformity 9.1 Measuring conformity with the project specification 9.1.1 General 9.1.2 New or replacement drains or sewers 9.1.3 Renovation and repair systems |
22 | 9.1.4 Measuring conformity 9.2 Non-conformities 9.3 Post project appraisal 10 Review of plan and programme |