{"id":254384,"date":"2024-10-19T16:48:32","date_gmt":"2024-10-19T16:48:32","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-612351995\/"},"modified":"2024-10-25T12:12:37","modified_gmt":"2024-10-25T12:12:37","slug":"bs-en-612351995","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-612351995\/","title":{"rendered":"BS EN 61235:1995"},"content":{"rendered":"
Applies to synthetic materials intended for tools to work on equipment at voltage above 1 kV but does not cover special attachments.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | BRITISH STANDARD <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Committees responsible for this British\ufffdStandard <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Section 1 General 1 Scope 2 Normative references 3 Definitions Terms defined in accordance with IEC\ufffd50(151) type test routine test sampling test acceptance test <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Terms defined in accordance with IEC 410 minor defect major defect critical defect Definitions of special terms reinforced tube standard tube light tube 4 Classification Mechanical category Electrical category <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Section 2 Technical characteristics 5 Materials 6 Diameters of tubes <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Section 3 Type tests 7 General Table 2 Number of lengths of tubes required for tests 8 Visual Inspection and dimensional check 8.1 Visual inspection 8.2 Dimensional check <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 9 Dielectric tests Dielectric tests before and after exposure to humidity <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Table 3 Test results Dielectric wet test <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 10 Mechanical tests Bending tests Table 4 <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Table 6 Torsion test Table 7 Crushing test <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Table 9 11 Mechanical fatigue tests Bending test Dielectric tests <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Section 4 Routine tests and sampling tests 12 Routine tests 13 Sampling tests 14 Additional tests not indicated <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Section 5 Special clauses 15 Marking 16 Modification 17 Acceptance 18 Quality assurance plan <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | Annex A (normative) Dielectric tests before and after exposure to humidity Figure A.1 Test arrangement <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Figure A.2 Assembly diagram <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Figure A.3 Constructional drawing for guard electrodes (two required) <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Figure A.4 Constructional drawing for guard electrodes, parts A and B <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Figure A.5a Figure A.5 Constructional drawing for guard electrode parts according to test-piece diameter <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Figure A.5b Figure A.5c Figure A.5 Constructional drawing for guard electrode parts according to test-piece diameter <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Annex B (normative) Dielectric wet test Figure B.1 Test arrangement Figure B.2 Details of electrode arrangement <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Annex C (normative) Mechanical tests Figure C.1 Figure C.2 Bending test \u2014 detail of supports <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Figure C.3 Torsion test \u2014 Examples for fixing tubes <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Figure C.4 Crushing test <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Annex D (normative) Routine tests Figure D.1 Typical test arrangement <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Annex E (normative) Sampling procedure General Table E.1 Classification of defects Table E.2 Sampling plans Plan for major defects <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Annex F (informative) Acceptance tests Annex ZA (normative) Normative references to international publications with their corresponding European … <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Live working. Insulating hollow tubes for electrical purposes<\/b><\/p>\n |