{"id":389372,"date":"2024-10-20T03:49:43","date_gmt":"2024-10-20T03:49:43","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iec-ts-63222-12021\/"},"modified":"2024-10-26T07:01:37","modified_gmt":"2024-10-26T07:01:37","slug":"bsi-pd-iec-ts-63222-12021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iec-ts-63222-12021\/","title":{"rendered":"BSI PD IEC TS 63222-1:2021"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nundefined <\/td>\n<\/tr>\n
4<\/td>\nCONTENTS <\/td>\n<\/tr>\n
6<\/td>\nFOREWORD <\/td>\n<\/tr>\n
8<\/td>\nINTRODUCTION <\/td>\n<\/tr>\n
9<\/td>\n1 Scope <\/td>\n<\/tr>\n
10<\/td>\n2 Normative references
Tables
Table 1 \u2013 Content of IEC TS 63222-1 <\/td>\n<\/tr>\n
12<\/td>\n3 Terms, definitions and abbreviated terms
3.1 Terms and definitions <\/td>\n<\/tr>\n
14<\/td>\n3.2 Abbreviated terms
Table 2 \u2013 Abbreviations of IEC TS 63222-1 <\/td>\n<\/tr>\n
15<\/td>\n4 Use cases list
4.1 List of business use cases and business roles of the domains
Figure 1 \u2013 Organisation of the use cases <\/td>\n<\/tr>\n
16<\/td>\nTable 3 \u2013 Lists of business use cases <\/td>\n<\/tr>\n
17<\/td>\n4.2 List of system use cases and system roles
Table 4 \u2013 Business roles of IEC TS 63222-1
Table 5 \u2013 Lists of the system use cases <\/td>\n<\/tr>\n
18<\/td>\n5 Provisions
5.1 Power quality assessment
5.1.1 General
Table 6 \u2013 Lists of system roles <\/td>\n<\/tr>\n
19<\/td>\n5.1.2 Monitoring assessment
5.1.3 Monitoring assessment process
Figure 2 \u2013 Overview of the power quality management main functions <\/td>\n<\/tr>\n
20<\/td>\n5.1.4 Predicted assessment
5.1.5 Predicted assessment process
5.1.6 Background description and analysis
5.1.7 Disturbance anticipation <\/td>\n<\/tr>\n
21<\/td>\n5.1.8 Impacts analysis
5.2 PQ monitoring system
5.2.1 General
5.2.2 Monitoring points <\/td>\n<\/tr>\n
22<\/td>\n5.2.3 Monitoring equipment
5.2.4 Related information and communication system
5.3 Economical assessment
5.3.1 General <\/td>\n<\/tr>\n
23<\/td>\n5.3.2 Economical assessment of PQ provisions <\/td>\n<\/tr>\n
24<\/td>\n5.3.3 Economical assessment of unsatisfactory PQ objectives\/results <\/td>\n<\/tr>\n
25<\/td>\n5.4 PQ requirement
5.5 Mitigation\/Trouble shooting
5.5.1 Total requirements <\/td>\n<\/tr>\n
26<\/td>\n5.5.2 Power quality mitigation scheme <\/td>\n<\/tr>\n
28<\/td>\nAnnex A (normative)Use case
A.1 Business use cases
A.1.1 BUC 1: Manage power quality over the grid <\/td>\n<\/tr>\n
30<\/td>\nA.1.2 BUC 2: Manage complaints on power quality over the network <\/td>\n<\/tr>\n
38<\/td>\nA.1.3 BUC 3: Provide reports on network power quality <\/td>\n<\/tr>\n
44<\/td>\nA.1.4 BUC 4: Take into account power quality constraints in connecting a user to the grid <\/td>\n<\/tr>\n
50<\/td>\nA.2 System UCs
A.2.1 SUC1: Measure power quality on a specific point of the network <\/td>\n<\/tr>\n
62<\/td>\nA.2.2 SUC2: Monitor power quality on the network <\/td>\n<\/tr>\n
71<\/td>\nA.2.3 SUC3: Assess the emission limit related to power quality technical parameters in power system <\/td>\n<\/tr>\n
76<\/td>\nAnnex B (informative)Main contents and requirements of power quality monitoring assessment report
B.1 Overview
B.2 Basic information of the assessment object
B.3 Basic information of power grid
B.4 Basis of assessment and standard
B.5 Monitoring instructions
B.6 Analysis and conclusion
B.7 Measures and suggestions (as required)
B.8 Attachments <\/td>\n<\/tr>\n
77<\/td>\nAnnex C (informative)Main contents and requirements of power quality predicted assessment report
C.1 Overview
C.2 Basic information of the assessment object
C.3 Basic situation of power grid
C.4 Basis of assessment and standard
C.5 Brief description of assessment method <\/td>\n<\/tr>\n
78<\/td>\nC.6 Calculation and analysis
C.7 Measures and suggestions (as required)
C.8 Conclusion
C.9 Attachments <\/td>\n<\/tr>\n
79<\/td>\nAnnex D (informative)Economic data of power quality
D.1 Data structure
D.2 Basic data of economic cost of power users <\/td>\n<\/tr>\n
80<\/td>\nD.3 Basic data of economic cost of public distribution network
D.4 Power quality related monitoring data <\/td>\n<\/tr>\n
81<\/td>\nD.5 Equipment and system parameters <\/td>\n<\/tr>\n
82<\/td>\nBibliography
IEC references <\/td>\n<\/tr>\n
83<\/td>\nNon-IEC references <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Power quality management – General guidelines<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2022<\/td>\n84<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":389380,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-389372","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/389372","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/389380"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=389372"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=389372"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=389372"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}