{"id":446815,"date":"2024-10-20T08:48:42","date_gmt":"2024-10-20T08:48:42","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-23-30478076-dc-2023\/"},"modified":"2024-10-26T16:25:08","modified_gmt":"2024-10-26T16:25:08","slug":"bsi-23-30478076-dc-2023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-23-30478076-dc-2023\/","title":{"rendered":"BSI 23\/30478076 DC 2023"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
8<\/td>\n | 1 Modification to Clause\u00a02, \u201cNormative references\u201d 2 Modifications to Clause\u00a03, \u201cTerms and definitions\u201d 3 Modification to 3.2, \u201cSymbols, abbreviated terms and units\u201d <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 4 Modification to 6.3, \u201cWater(brine)-to-air-units\u201d 5 Modification to 6.4.2, \u201cLow temperature application\u201d 6 Modification to 6.4.3, \u201cIntermediate temperature application\u201d 7 Modification to 6.4.4, \u201cMedium temperature application\u201d 8 Modification to 6.4.5, \u201cHigh temperature application\u201d 9 Modification to 6.5.2, \u201cLow temperature application\u201d 10 Modification to 6.5.3, \u201cIntermediate temperature application\u201d 11 Modification to 6.5.4, \u201cMedium temperature application\u201d 12 Modification to 6.5.5, \u201cHigh temperature application 13 Modification to 8.1, \u201cGeneral\u201d <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 14 Modification to 8.2.2.2, \u201cTest installation and measurement\u201d 15 Modification to 8.2.3, \u201cBoiler testing\u201d 16 Modification to 8.3.2, \u201cTest conditions and measurements\u201d 17 Modification to 8.3.3, \u201cTest installation\u201d 18 Modification to 8.3.4.1, \u201cVolume Flow\u201d 19 Modification to 11.1, \u201cGeneral\u201d 20 Modification to 11.2, \u201cRefrigerant piping\u201d 21 Modification to 11.3, \u201cBasic principles\u201d 22 Modification to 11.4, \u201cUncertainties of measurement\u201d 23 Modification to 11.5.1, \u201cGeneral\u201d <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 24 Modification to 11.5.2.1, \u201cGeneral\u201d 25 Modification to 11.5.3, \u201cAir-to-water(brine), water(brine)-to-water(brine) and DX-to-water(brine) units \u2013 Determination of the degradation coefficient\u00a0Cd\u201d 26 Modification to 11.6.3, \u201cCompensation method\u201d 27 Modification to 12.2, \u201cMeasurement of electric power input during thermostat-off mode\u201d 28 Modification to Clause\u00a013, \u201cTest report\u201d 29 Addition of a new Clause\u00a015, \u201cControls verification procedure (CVP)\u201d 30 Addition of a new Clause\u00a016, \u201cIndoor unit(s) air flow rate measurement\u201d <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 31 Modification to E.2, \u201cTest procedure for an air-to-water unit with fixed water flow rate\u201d 32 Modification to E.3, \u201cTest procedure for an air-to-water unit with variable water flow rate\u201d 33 Modification to Annex\u00a0G, \u201cCalculation example for SCOPon and SCOPnet \u2013 Application to a fixed capacity air-to-water(brine) heat pump used for low temperature application\u201d 34 Modification to Annex\u00a0H, \u201cCalculation example for SCOPon and SCOPnet\u201d 35 Modification to Annex\u00a0K, \u201cCompensation methods for air-to-water(brine) and water(brine)-to-water(brine) units\u201d 36 Modification to M.2, \u201cTest methods\u201d 37 Modification to M.2.2, \u201cAir enthalpy method\u201d <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 38 Modification to M.2.2.1, \u201c3-room air enthalpy method\u201d 39 Addition of annexes <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Annex\u00a0N (normative)Controls verification procedure (CVP) test to verify the compressor frequency N.1 General <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | N.2 Air-to-air units N.2.1 General N.2.2 Indoor test room settings N.2.3 Test procedure <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | N.3 Air-to-water(brine), water(brine)-to-water(brine) systems and DX-to-water(brine) systems N.3.1 General <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | N.3.2 Temperature settings N.3.3 Test procedure <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | N.4 Uncertainty of measurement and permissible deviation <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | N.5 Retesting <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Annex\u00a0O (normative)Indoor unit airflow rate measurement, setting and verification for air-to-air units with a rated capacity of\u00a0\u2264\u00a012\u00a0kW O.1 General O.2 Test conditions <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | O.3 Airflow measurement O.4 Uncertainty of measurement and permissible deviations <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" BS EN 14825 AMD 1. Air conditioners, liquid chilling packages and heat pumps, with electrically driven compressors, for space heating and cooling, commercial and process cooling. Testing and rating at part load conditions and calculation of seasonal performance<\/b><\/p>\n |