ASHRAE Guideline 0 2013
$54.17
ASHRAE Guideline 0-2013 The Commissioning Process
Published By | Publication Date | Number of Pages |
ASHRAE | 2013 | 72 |
ASHRAE Guideline 0 presents best practices for applying whole-building commissioning to facilities. The principles and processes included apply to all phases of new construction and renovation projects and provide a uniform, integrated, and consistent approach to commissioning. ASHRAE Guideline 0 includes the Total Building Commissioning Process (TBCxP) as defined by National Institute of Building Sciences (NIBS) in its Commissioning Process Guideline 0. The 2013 edition of the guideline addresses changes to project delivery systems resulting from the evolution of whole-building commissioning in the life cycle and sustainable measurement and verification processes. It emphasizes the role of the owner in clearly documenting the Owner’s Project Requirements so they may be transferred to design criteria and construction documents in a way that provides consistency and continuity throughout the scope of the project. The roles and responsibilities of the owner and Commissioning Authority have been further outlined, and annexes have been updated to assist in further understanding the commissioning process.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | ASHRAE Guideline 0-2013 |
3 | CONTENTS |
4 | FOREWORD 1. PURPOSE 2. SCOPE |
5 | 3. UTILIZATION 4. DEFINITIONS |
6 | 5. PREDESIGN PHASE |
10 | 6. DESIGN PHASE |
14 | 7. CONSTRUCTION PHASE |
18 | 8. OCCUPANCY/OPERATIONS PHASE |
20 | 9. REFERENCES |
21 | NORMATIVE ANNEX A—GUID FOR DEVELOPING SUPPLEMENTARY TECHNICAL GUIDELINES FOR THE COMMISSIONING PROCESS |
24 | INFORMATIVE ANNEX B—COMMISSIONING PROCESS FLOW CHART |
26 | INFORMATIVE ANNEX C—COST AND BENEFITS OF THE COMMISSIONING PROCESS |
27 | INFORMATIVE ANNEX D—COMMISSIONING PROCESS DOCUMENTATION MATRIX |
30 | INFORMATIVE ANNEX E—COMMISSIONING PROCESS REQUEST FOR QUALIFICATIONS |
33 | INFORMATIVE ANNEX F—ROLES AND RESPONSIBILITIES |
35 | INFORMATIVE ANNEX G—COMMISSIONING PLAN |
36 | INFORMATIVE ANNEX H—ACCEPTANCE PLAN |
38 | INFORMATIVE ANNEX I—OWNER’S PROJECT REQUIREMENTS WORKSHOP GUIDANCE |
40 | INFORMATIVE ANNEX J—OWNER’S PROJECT REQUIREMENTS |
44 | INFORMATIVE ANNEX K—BASIS OF DESIGN (BoD) |
45 | INFORMATIVE ANNEX L—SPECIFICATIONS |
51 | INFORMATIVE ANNEX M—CONSTRUCTION CHECKLISTS |
56 | INFORMATIVE ANNEX N—QUALITY-BASED SAMPLING EXAMPLES |
59 | INFORMATIVE ANNEX O—SYSTEMS MANUAL |
61 | INFORMATIVE ANNEX P—TRAINING MANUAL AND TRAINING NEEDS |
67 | INFORMATIVE ANNEX Q—ADDENDA DESCRIPTION INFORMATION |