Shopping Cart

No products in the cart.

BS EN IEC 61784-5-8:2024

$215.11

Industrial networks. Profiles – Installation of fieldbuses. Installation profiles for CPF 8

Published By Publication Date Number of Pages
BSI 2024 90
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

IEC 61784-5-8:2024 is available as IEC 61784-5-8:2024 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.IEC 61784-5-8:2024 specifies the installation profiles for CPF 8 (CC-LinkTM[1]). The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918:2018, IEC 61918:2018/AMD1:2022 and IEC 61918:2018/AMD2:2024. [1] CC-Link™, CC-Link/LT™ and CC?Link IE™ are trade names of Mitsubishi Electric Co., control of trade name use is given to CCLink Partner Association. This information is given for the convenience of users of this document and does not constitute an endorsement by IEC of the trademark holder or any of its products. Compliance to this profile does not require use of the trade name. Use of the trade name requires permission of the trade name holder.

PDF Catalog

PDF Pages PDF Title
2 undefined
5 Annex ZA (normative)Normative references to international publicationswith their corresponding European publications
6 English
CONTENTS
11 FOREWORD
13 INTRODUCTION
Figures
Figure 1 – Standards relationships
14 1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
15 4 CPF 8: Overview of installation profiles
5 Installation profile conventions
16 6 Conformance to installation profiles
17 Annex A (normative) CP 8/1 and CP 8/2 (CC-Link™/V1 and CC-Link™/V2) specific installation profile
A.1 Installation profile scope
A.2 Normative references
A.3 Installation profile terms, definitions, and abbreviated terms
A.3.1 Terms and definitions
A.3.2 Abbreviated terms
A.3.3 Conventions for installation profiles
A.4 Installation planning
A.4.1 General
18 A.4.2 Planning requirements
A.4.3 Network capabilities
19 Figure A.1 – Pass-through connector configuration
Figure A.2 – Bus t-branch topology
20 A.4.4 Selection and use of cabling components
Tables
Table A.1 – Basic network characteristics for balanced cabling not based on Ethernet
Table A.2 – Bus t-branch network characteristics
21 Table A.3 – Information relevant to copper cable: fixed cables
22 Figure A.3 – Wiring
Table A.4 – Connectors for copper cabling CPs not based on Ethernet
25 A.4.5 Cabling planning documentation
A.4.6 Verification of cabling planning specification
A.5 Installation implementation
A.5.1 General requirements
26 A.5.2 Cable installation
Table A.5 – Parameters for balanced cables
27 A.5.3 Connector installation
A.5.4 Terminator installation
Table A.6 – Cable conductor assignments
28 A.5.5 Device installation
A.5.6 Coding and labelling
A.5.7 Earthing and bonding of equipment and devices and shield cabling
A.5.8 As-implemented cabling documentation
29 A.6 Installation verification and installation acceptance test
A.6.1 General
A.6.2 Installation verification
30 A.6.3 Installation acceptance test
A.7 Installation administration
A.8 Installation maintenance and installation troubleshooting
31 Annex B (normative) CP 8/3 (CC-Link/LT™) specific installation profile
B.1 Installation profile scope
B.2 Normative references
B.3 Installation profile terms, definitions, and abbreviated terms
B.3.1 Terms and definitions
B.3.2 Abbreviated terms
B.3.3 Conventions for installation profiles
B.4 Installation planning
B.4.1 General
32 B.4.2 Planning requirements
B.4.3 Network capabilities
33 Figure B.1 – Powered network topology
Figure B.2 – Bus t-branch topology
34 Table B.1 – Basic network characteristics for balanced cabling not based on Ethernet
Table B.2 – CP 8/3 additional topology length limits
35 B.4.4 Selection and use of cabling components
Figure B.3 – Flat cable cross section – with key
Figure B.4 – Flat cable cross section – without key
36 Figure B.5 – Flat cable polarity marking
Table B.3 – Information relevant to copper cable: cords
37 Figure B.6 – Wiring
38 Figure B.7 – Flat cable connector and terminal cover
39 Table B.4 – Connectors for copper cabling CPs not based on Ethernet
42 B.4.5 Cabling planning documentation
B.4.6 Verification of cabling planning specification
B.5 Installation implementation
B.5.1 General requirements
B.5.2 Cable installation
Table B.5 – Parameters for balanced cables
43 B.5.3 Connector installation
Table B.6 – Flat cable conductor assignments
44 B.5.4 Terminator installation
B.5.5 Device installation
B.5.6 Coding and labelling
B.5.7 Earthing and bonding of equipment and devices and shield cabling
B.5.8 As-implemented cabling documentation
45 B.6 Installation verification and installation acceptance test
B.6.1 General
B.6.2 Installation verification
46 B.6.3 Installation acceptance test
B.7 Installation administration
B.8 Installation maintenance and installation troubleshooting
47 Annex C (normative) CP 8/4 (CC-Link IE™ Controller Network) specific installation profile
C.1 Installation profile scope
C.2 Normative references
C.3 Installation profile terms, definitions, and abbreviated terms
C.3.1 Terms and definitions
C.3.2 Abbreviated terms
C.3.3 Conventions for installation profiles
C.4 Installation planning
C.4.1 General
C.4.2 Planning requirements
48 C.4.3 Network capabilities
49 C.4.4 Selection and use of cabling components
Table C.1 – Network characteristics for balanced cabling based on Ethernet
Table C.2 – Network characteristics for optical fibre cabling
50 Table C.3 – Information relevant to copper cable: fixed cables
51 Table C.4 – Information relevant to optical fibre cables
Table C.5 – Connectors for balanced cabling CPs based on Ethernet
52 Table C.6 – Optical fibre connecting hardware
Table C.7 – Relationship between FOC and fibre types (CP 8/4)
55 C.4.5 Cabling planning documentation
C.4.6 Verification of cabling planning specification
C.5 Installation implementation
C.5.1 General requirements
56 C.5.2 Cable installation
Table C.8 – Parameters for balanced cables
Table C.9 – Parameters for silica optical fibre cables
57 C.5.3 Connector installation
C.5.4 Terminator installation
58 C.5.5 Device installation
C.5.6 Coding and labelling
C.5.7 Earthing and bonding of equipment and devices and shield cabling
59 C.5.8 As-implemented cabling documentation
C.6 Installation verification and installation acceptance test
C.6.1 General
C.6.2 Installation verification
60 C.6.3 Installation acceptance test
C.7 Installation administration
C.8 Installation maintenance and installation troubleshooting
61 Annex D (normative) CP 8/5 (CC-Link IE™ Field Network) specific installation profile
D.1 Installation profile scope
D.2 Normative references
D.3 Installation profile terms, definitions, and abbreviated terms
D.3.1 Terms and definitions
D.3.2 Abbreviated terms
D.3.3 Conventions for installation profiles
D.4 Installation planning
D.4.1 General
D.4.2 Planning requirements
62 D.4.3 Network capabilities
63 D.4.4 Selection and use of cabling components
Table D.1 – Network characteristics for balanced cabling based on Ethernet
64 Table D.2 – Information relevant to copper cable: fixed cables
65 Table D.3 – Connectors for balanced cabling CPs based on Ethernet
68 D.4.5 Cabling planning documentation
D.4.6 Verification of cabling planning specification
D.5 Installation implementation
D.5.1 General requirements
D.5.2 Cable installation
69 Table D.4 – Parameters for balanced cables
70 D.5.3 Connector installation
D.5.4 Terminator installation
D.5.5 Device installation
D.5.6 Coding and labelling
D.5.7 Earthing and bonding of equipment and devices and shield cabling
71 D.5.8 As-implemented cabling documentation
D.6 Installation verification and installation acceptance test
D.6.1 General
D.6.2 Installation verification
72 D.6.3 Installation acceptance test
73 D.7 Installation administration
D.8 Installation maintenance and installation troubleshooting
74 Annex E (normative) CP 8/6 (CC-Link IE™ TSN) specific installation profile
E.1 Installation profile scope
E.2 Normative references
E.3 Installation profile terms, definitions, and abbreviated terms
E.3.1 Terms and definitions
E.3.2 Abbreviated terms
E.3.3 Conventions for installation profiles
E.4 Installation planning
E.4.1 General
75 E.4.2 Planning requirements
E.4.3 Network capabilities
76 Table E.1 – Network characteristics for balanced cabling based on Ethernet
77 E.4.4 Selection and use of cabling components
Table E.2 – Network characteristics for optical fibre cabling
78 Table E.3 – Information relevant to copper cable: fixed cables
79 Table E.4 – Information relevant to optical fibre cables
80 Table E.5 – Connectors for balanced cabling CPs based on Ethernet
Table E.6 – Optical fibre connecting hardware
Table E.7 – Relationship between FOC and fibre types (CP 8/6)
83 E.4.5 Cabling planning documentation
E.4.6 Verification of cabling planning specification
84 E.5 Installation implementation
E.5.1 General requirements
E.5.2 Cable installation
Table E.8 – Parameters for balanced cables
Table E.9 – Parameters for silica optical fibre cables
85 E.5.3 Connector installation
86 E.5.4 Terminator installation
E.5.5 Device installation
E.5.6 Coding and labelling
E.5.7 Earthing and bonding of equipment and devices and shield cabling
87 E.5.8 As-implemented cabling documentation
E.6 Installation verification and installation acceptance test
E.6.1 General
E.6.2 Installation verification
88 E.6.3 Installation acceptance test
E.7 Installation administration
E.8 Installation maintenance and installation troubleshooting
89 Bibliography
BS EN IEC 61784-5-8:2024
$215.11