BS EN ISO 11011:2015
$198.66
Compressed air. Energy efficiency. Assessment
Published By | Publication Date | Number of Pages |
BSI | 2015 | 62 |
This International Standard sets requirements for conducting and reporting the results of a compressed air system assessment (hereafter referenced as an “assessment”) that considers the entire system, from energy inputs to the work performed as the result of these inputs.
This International Standard considers compressed air systems as three functional subsystems:
-
supply which includes the conversion of primary energy resource to compressed air energy;
-
transmission which includes movement of compressed air energy from where it is generated to where it is used;
-
demand which includes the total of all compressed air consumers, including productive end-use applications and various forms of compressed air waste.
This International Standard sets requirements for
-
analysing the data from the assessment,
-
reporting and documentation of assessment findings, and
-
identification of an estimate of energy saving resulting from the assessment process.
This International Standard identifies the roles and responsibilities of those involved in the assessment activity.
This International Standard provides indicative information in Annexes B, C, D, and E of the type of data to be collected to assist in a successful assessment. The information provided is not exhaustive and therefore is not intended to restrict the inclusion of other data. The form and presentation of the information given in the annexes is also not intended to restrict the manner of presentation of the reporting to the client.
PDF Catalog
PDF Pages | PDF Title |
---|---|
7 | Foreword |
8 | Introduction |
9 | Section sec_1 Section sec_2 Section sec_3 1 Scope 2 Normative references 3 Terms and definitions |
10 | Section sec_3.1 Section sec_3.1.1 Section sec_3.1.2 Section sec_3.1.3 Section sec_3.1.4 Section sec_3.1.5 Section sec_3.1.6 Section sec_3.1.7 Section sec_3.1.8 Section sec_3.1.9 Section sec_3.1.10 3.1 General |
11 | Section sec_3.1.11 Section sec_3.1.12 Section sec_3.1.13 Section sec_3.1.14 Section sec_3.1.15 Section sec_3.2 Section sec_3.2.1 Section sec_3.2.2 Section sec_3.2.3 Section sec_3.2.4 Section sec_3.2.5 Section sec_3.2.6 3.2 Flow |
12 | Section sec_3.2.7 Section sec_3.3 Section sec_3.3.1 Section sec_3.3.2 Section sec_3.3.3 Section sec_3.3.4 Section sec_3.3.5 Section sec_3.3.6 Section sec_3.3.6.1 Section sec_3.3.6.2 Section sec_3.3.7 Section sec_3.3.8 3.3 Pressure |
13 | Section sec_3.3.8.1 Section sec_3.3.8.2 Section sec_3.3.9 Section sec_3.3.9.1 Section sec_3.3.9.2 Section sec_3.3.10 Section sec_3.4 Section sec_3.4.1 Section sec_3.4.2 Section sec_3.5 Section sec_3.5.1 3.4 Storage 3.5 Volume |
14 | Section sec_3.5.2 Section sec_3.5.3 Section sec_4 Section sec_4.1 Section sec_4.1.1 Section sec_4.1.1.1 Section sec_4.1.1.2 Section sec_4.1.1.3 Section sec_4.1.1.4 4 Roles and responsibilities 4.1 Identification of assessment team members |
15 | Section sec_4.2 Section sec_4.3 Section sec_4.4 Section sec_4.6 Section sec_4.7 4.2 Site management support 4.3 Communications 4.4 Access to equipment, resources, and information 4.5 Assessment objectives and scope 4.6 Identification of other assessment team members 4.7 Objective check |
16 | Section sec_5.1 Section sec_5.2 Section sec_5.3 5 Assessment methodology 5.1 General 5.2 Systems engineering methods 5.3 Systems engineering process |
17 | Section sec_5.4 Section sec_5.4.1 Section sec_5.4.2 Figure fig_1 5.4 System assessment process |
18 | Section sec_6 Section sec_6.1 Section sec_6.2 Section sec_6.2.1 Section sec_6.2.2 Section sec_6.2.3 Section sec_6.3 Section sec_6.3.1 Section sec_6.3.2 6 Parameters and their determination 6.1 General 6.2 Measurement 6.3 Pressure |
19 | Section sec_6.3.3 Section sec_6.4 Section sec_6.4.1 Section sec_6.4.2 Section sec_6.4.3 6.4 Flow rate |
20 | Section sec_6.5 Section sec_6.5.1 Section sec_6.5.2 Section sec_6.5.3 Section sec_6.5.3.1 Section sec_6.5.3.2 6.5 Power |
21 | Section sec_7 Section sec_7.1 Section sec_7.2 Section sec_7.3 Section sec_7.4 Section sec_7.5 Section sec_7.6 7 Initial data collection and evaluation 7.1 General 7.2 Plant background 7.3 Plant function 7.4 Compressed air system definition 7.5 Inventory of key end-use air demands 7.6 Heat recovery |
22 | Section sec_7.7 Section sec_7.7.1 Section sec_7.7.2 Section sec_7.8 Section sec_7.9 Section sec_7.10 7.7 Baseline period and duration of data logging 7.8 Energy use 7.9 Compressed air system supply efficiency 7.10 System volume |
23 | Section sec_7.11 Section sec_7.11.1 Section sec_7.11.2 Section sec_7.12 Section sec_7.12.1 Section sec_7.12.2 Section sec_7.13 Section sec_7.14 Section sec_7.14.1 Section sec_7.14.2 Section sec_7.14.3 Section sec_7.14.4 Section sec_7.15 7.11 Pressure 7.12 Flowrate 7.13 Critical air demands 7.14 Compressed air waste 7.15 Air treatment |
24 | Section sec_7.16 Section sec_7.17 Section sec_7.17.1 Section sec_7.17.2 Section sec_7.18 Section sec_7.19 Section sec_8 Section sec_8.1 7.16 Compressor control 7.17 Storage 7.18 Maintenance 7.19 Ambient intake conditions 8 Analysis of data from assessment 8.1 General |
25 | Section sec_8.2 Section sec_8.2.1 Section sec_8.2.2 Section sec_8.2.3 8.2 Baseline profiles |
26 | Section sec_8.2.4 Section sec_8.2.5 Section sec_8.2.6 Section sec_8.2.6.1 Section sec_8.2.6.2 Section sec_8.2.6.3 |
27 | Section sec_8.3 Section sec_8.4 Section sec_8.4.1 Section sec_8.4.2 8.3 System volume 8.4 Pressure profile |
28 | Section sec_8.4.3 Section sec_8.4.4 Section sec_8.4.5 |
29 | Section sec_8.4.6 Section sec_8.5 Section sec_8.5.1 Section sec_8.5.2 Section sec_8.5.3 8.5 Perceived high-pressure demand |
30 | Section sec_8.5.4 Section sec_8.5.5 Section sec_8.5.5.1 Section sec_8.5.5.2 Section sec_8.5.5.3 Section sec_8.6 Section sec_8.6.1 8.6 Demand profile |
31 | Section sec_8.6.2 Section sec_8.6.3 Section sec_8.6.4 Section sec_8.7 Section sec_8.7.1 8.7 Critical air demands |
32 | Section sec_8.7.2 Section sec_8.7.3 Section sec_8.8 Section sec_8.8.1 Section sec_8.8.2 8.8 Compressed air waste |
33 | Section sec_8.8.3 Section sec_8.8.4 Section sec_8.9 Section sec_8.9.1 Section sec_8.9.2 Section sec_8.9.3 Section sec_8.9.4 8.9 Optimized air treatment |
34 | Section sec_8.9.5 Section sec_8.10 8.10 Reduced system operating pressure |
35 | Section sec_8.11 Section sec_8.11.1 Section sec_8.11.2 Section sec_8.11.3 Section sec_8.12 8.11 Balance of supply and demand 8.12 Maintenance opportunities |
36 | Section sec_8.13 Section sec_9 8.13 Heat recovery opportunities 9 Reporting and documentation of assessment findings 9.1 Assessment report |
37 | Section sec_9.2 Section sec_9.3 Section sec_9.4 9.2 Confidentiality 9.3 Energy-saving opportunities 9.4 Data for third-party review |
38 | Annex sec_A Annex sec_A.1 Annex sec_A.2 Annex sec_A.3 Annex A (informative) Introduction to energy assessment |
39 | Annex sec_A.5 |
40 | Annex sec_B Annex sec_B.1 Annex sec_B.1.1 Table tab_B.1 Annex sec_B.1.2 Annex sec_B.1.3 Annex sec_B.1.4 Annex sec_B.1.5 Annex B (informative) Assessment activities — General |
41 | Table tab_B.2 Annex sec_B.1.6 Table tab_B.3 Annex sec_B.1.7 Annex sec_B.1.8 Table tab_B.4 Annex sec_B.1.9 |
42 | Table tab_B.5 Annex sec_B.1.10 |
43 | Table tab_B.6 |
44 | Table tab_B.7 Annex sec_B.1.12 Table tab_B.8 |
45 | Annex sec_C Annex sec_C.1 Table tab_C.1 Annex C (informative) Assessment activities — Supply |
46 | Figure fig_C.1 Figure fig_C.2 Figure fig_C.3 |
47 | Annex sec_C.2 Annex sec_C.2.1 Table tab_C.2 Annex sec_C.2.2 Table tab_C.3 |
48 | Annex sec_C.2.3 Table tab_C.4 Annex sec_C.2.4 Table tab_C.5 |
49 | Annex sec_C.2.5 Table tab_C.6 Annex sec_C.2.6 Table tab_C.7 Annex sec_C.3 Annex sec_C.3.1 Table tab_C.8 |
50 | Annex sec_C.3.2 |
51 | Annex sec_D Annex sec_D.1 Table tab_D.1 Annex D (informative) Assessment activities — Transmission |
52 | Figure fig_D.1 Annex sec_D.2 Annex sec_D.2.1 Table tab_D.2 |
53 | Annex sec_D.2.2 Annex sec_D.2.3 Annex sec_D.2.3.1 Annex sec_D.2.3.2 Table tab_D.3 |
54 | Annex sec_D.2.3.3 Table tab_D.4 Annex sec_D.2.3.4 Table tab_D.5 |
55 | Annex sec_E Annex sec_E.1 Table tab_E.1 Annex E (informative) Assessment activities — Demand |
56 | Figure fig_E.1 Annex sec_E.2 Annex sec_E.2.1 |
57 | Table tab_E.2 Annex sec_E.2.2 Table tab_E.3 Annex sec_E.2.3 Annex sec_E.2.3.1 Annex sec_E.2.3.2 Table tab_E.4 Annex sec_E.2.4 |
58 | Annex sec_F Annex sec_F.1 Annex sec_F.2 Annex sec_F.3 Annex sec_F.4 Annex F (informative) Competencies |
59 | Reference ref_1 Reference ref_2 Reference ref_3 Reference ref_4 Reference ref_5 Reference ref_6 Reference ref_7 Reference ref_8 Bibliography |