BS EN ISO 11296-3:2018
$142.49
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks – Lining with close-fit pipes
Published By | Publication Date | Number of Pages |
BSI | 2018 | 26 |
This document, in conjunction with ISO 11296‑1, specifies requirements and test methods for close-fit lining systems used for the renovation of underground non-pressure drainage and sewerage networks.
It applies to pipes and fittings made of polyethylene (PE) or unplasticized poly(vinyl chloride) (PVC‑U) as manufactured, as well to the installed lining system with its associated joints.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
4 | European foreword |
7 | Foreword |
8 | Introduction |
11 | 1 Scope 2 Normative references |
12 | 3 Terms and definitions 3.1 General 3.2 Techniques 3.3 Characteristics 3.4 Materials 3.5 Product stages 3.6 Service conditions |
13 | 3.7 Joints 4 Symbols and abbreviated terms 5 Pipes at the “M” stage 5.1 Materials 5.1.1 General 5.1.2 Distinction between PVC-U types 5.1.3 Virgin material 5.1.4 Reprocessable material and recyclable material |
14 | 5.2 General characteristics 5.2.1 Appearance 5.2.2 Colour 5.3 Material characteristics |
15 | 5.4 Geometric characteristics 5.5 Mechanical characteristics 5.6 Physical characteristics 5.7 Jointing |
16 | 5.8 Marking 6 Fittings at the “M” stage 7 Ancillary components 8 Fitness for purpose of the installed lining system at the “I” stage 8.1 Materials 8.2 General characteristics 8.3 Material characteristics 8.4 Geometric characteristics |
18 | 8.5 Mechanical characteristics |
19 | 8.6 Physical characteristics 8.7 Additional characteristics 8.8 Sampling 9 Installation practice 9.1 Preparatory work 9.2 Storage, handling and transport of pipes and fittings 9.3 Equipment 9.3.1 Butt fusion equipment and debeading equipment |
20 | 9.3.2 Reduction equipment 9.3.3 Pipe skids/rollers 9.3.4 Winching and rod-pulling equipment 9.3.5 Pipe entry guides 9.3.6 Reforming equipment 9.3.7 Electrofusion equipment |
21 | 9.3.8 Inspection equipment 9.3.9 Lifting equipment 9.4 Installation |
22 | 9.5 Process-related inspection and testing 9.6 Lining termination 9.7 Reconnection to existing manholes and laterals 9.8 Documentation 9.9 Final inspection and testing |
23 | Annex A (normative) Factory-folded heat-reverted polyethylene (PE) pipe — Determination of memory ability |
25 | Bibliography |