Shopping Cart

No products in the cart.

BS EN ISO 11296-3:2018

$142.49

Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks – Lining with close-fit pipes

Published By Publication Date Number of Pages
BSI 2018 26
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This document, in conjunction with ISO 11296‑1, specifies requirements and test methods for close-fit lining systems used for the renovation of underground non-pressure drainage and sewerage networks.

It applies to pipes and fittings made of polyethylene (PE) or unplasticized poly(vinyl chloride) (PVC‑U) as manufactured, as well to the installed lining system with its associated joints.

PDF Catalog

PDF Pages PDF Title
2 National foreword
4 European foreword
7 Foreword
8 Introduction
11 1 Scope
2 Normative references
12 3 Terms and definitions
3.1 General
3.2 Techniques
3.3 Characteristics
3.4 Materials
3.5 Product stages
3.6 Service conditions
13 3.7 Joints
4 Symbols and abbreviated terms
5 Pipes at the “M” stage
5.1 Materials
5.1.1 General
5.1.2 Distinction between PVC-U types
5.1.3 Virgin material
5.1.4 Reprocessable material and recyclable material
14 5.2 General characteristics
5.2.1 Appearance
5.2.2 Colour
5.3 Material characteristics
15 5.4 Geometric characteristics
5.5 Mechanical characteristics
5.6 Physical characteristics
5.7 Jointing
16 5.8 Marking
6 Fittings at the “M” stage
7 Ancillary components
8 Fitness for purpose of the installed lining system at the “I” stage
8.1 Materials
8.2 General characteristics
8.3 Material characteristics
8.4 Geometric characteristics
18 8.5 Mechanical characteristics
19 8.6 Physical characteristics
8.7 Additional characteristics
8.8 Sampling
9 Installation practice
9.1 Preparatory work
9.2 Storage, handling and transport of pipes and fittings
9.3 Equipment
9.3.1 Butt fusion equipment and debeading equipment
20 9.3.2 Reduction equipment
9.3.3 Pipe skids/rollers
9.3.4 Winching and rod-pulling equipment
9.3.5 Pipe entry guides
9.3.6 Reforming equipment
9.3.7 Electrofusion equipment
21 9.3.8 Inspection equipment
9.3.9 Lifting equipment
9.4 Installation
22 9.5 Process-related inspection and testing
9.6 Lining termination
9.7 Reconnection to existing manholes and laterals
9.8 Documentation
9.9 Final inspection and testing
23 Annex A (normative) Factory-folded heat-reverted polyethylene (PE) pipe — Determination of memory ability
25 Bibliography
BS EN ISO 11296-3:2018
$142.49