BS EN ISO 11297-1:2018
$142.49
Plastics piping systems for renovation of underground drainage and sewerage networks under pressure – General
Published By | Publication Date | Number of Pages |
BSI | 2018 | 28 |
This document specifies the requirements and test methods for plastics piping systems intended to be used for the renovation of underground drainage and sewerage networks under pressure, including both hydraulically and pneumatically pressurized systems. It is applicable to pipes and fittings, as manufactured, as well as to the installed lining system. It is not applicable to the existing pipeline or any non-structural sprayed coatings or annular filler.
This document gives the general requirements common to all relevant renovation techniques.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
4 | European foreword |
7 | Foreword |
8 | Introduction |
11 | 1 Scope 2 Normative references 3 Terms and definitions 3.1 General |
13 | 3.2 Techniques |
15 | 3.3 Characteristics |
17 | 3.4 Materials 3.5 Product stages |
18 | 3.6 Service conditions 4 Symbols and abbreviated terms 4.1 Symbols |
19 | 4.2 Abbreviated terms 5 Pipes at the “M” stage 5.1 Materials 5.2 General characteristics 5.3 Material characteristics 5.4 Geometric characteristics 5.5 Mechanical characteristics |
20 | 5.6 Physical characteristics 5.7 Jointing 5.8 Marking 6 Fittings at the “M” stage 6.1 Materials 6.2 General characteristics 6.3 Material characteristics 6.4 Geometric characteristics |
21 | 6.5 Mechanical characteristics 6.6 Physical characteristics 6.7 Jointing 6.8 Marking 7 Ancillary components 8 Fitness for purpose of the installed lining system at the “I” stage 8.1 Materials |
22 | 8.2 General characteristics 8.3 Material characteristics 8.4 Geometric characteristics 8.5 Mechanical characteristics |
23 | 8.6 Physical characteristics 8.7 Additional characteristics 8.8 Sampling 8.9 Regional requirements for the installed lining system 9 Installation practice 9.1 Preparatory work 9.2 Storage, handling and transport of pipes and fittings 9.3 Equipment 9.3.1 General |
24 | 9.3.2 Inspection equipment 9.3.3 Lifting equipment 9.4 Installation 9.4.1 General 9.4.2 Safety precautions 9.4.3 Simulated installations |
25 | 9.5 Process-related inspection and testing 9.6 Lining termination 9.7 Reconnection to the existing pipeline system 9.8 Final inspection and testing 9.9 Documentation |
26 | Bibliography |