BS EN ISO 21368:2023
$215.11
Adhesives. Guidelines for the fabrication of adhesively bonded structures and reporting procedures suitable for the risk evaluation of such structures
Published By | Publication Date | Number of Pages |
BSI | 2023 | 112 |
This document provides guidelines describing the adhesive bonding quality requirements suitable for use by adhesive user-companies utilizing adhesive bonding as a means of fabrication. In particular, the guidelines define various approaches to meeting quality requirements for fabrication and reporting procedures, both in workshops and on site. These guidelines aim to convey the importance of maintaining quality standards in fabrication and reporting procedures, keeping records and thus enabling documentation to provide the basis for risk evaluation of adhesively bonded structures in service and in use. These guidelines have been prepared such that: a) they are independent of the type of adhesively bonded structure; b) they are independent of adhesive user-companies’ and suppliers’ product recommendations; c) they define the quality requirements for adhesive bonding in terms of fabrication and reporting procedures, both in workshops and on site; d) they can be used as the basis for risk evaluation of adhesively bonded structures in service and in use; e) they can be used as a basis for assessing a fabricator’s capability to produce adhesively bonded structures fulfilling specified quality requirements when they are detailed in one or more of the following: — a contract between the parties involved; — an application standard; — a regulatory statement. The guidelines contained within this document can be adopted in full or selectively chosen by the adhesive user to suit the structure concerned. The guidelines provide a flexible framework for the control of adhesive bonding activities in the following cases. Case 1 The provision of specific requirements for adhesive bonding in contracts that require the adhesive user to have a quality system other than ISO 9001. Case 2 The provision of specific requirements for adhesive bonding as guidance to an adhesive user developing a quality system. Case 3 The provision of specific requirements for references in application standards that uses adhesive bonding as part of its requirements or in a contract between relevant parties. Case 4 The provision of a framework for fabrication and reporting procedures to a quality standard, suitable in particular as a basis for the risk evaluation of adhesively bonded structures.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
19 | 4.1 General |
20 | 4.2 Definition of safety classes |
21 | 4.3 Documentation of the classification according to safety classes 5.1 General |
22 | 5.2 Adhesive bonding operators (ABO) 5.2.1 General 5.2.2 Functions 5.2.3 Duties 5.2.4 Competences, knowledge and experiences |
23 | 5.3 Adhesive bonding coordinator (ABC) 5.3.1 General 5.3.2 Functions 5.3.3 Duties |
25 | 5.3.4 Competences 5.3.5 Organizational integration of adhesive bonding coordination |
26 | 5.4 Levels of competences, knowledge and experiences for adhesive bonding personnel (ABP) 5.4.1 General 5.4.2 Requirements for each level of competences, knowledge and experiences |
28 | 5.5 Assignment of the three competence levels to the safety classes depending on the respective scope of work — Correlation of the core elements |
29 | 5.6 Comparability of competences, knowledge and experience 5.7 Monitoring, inspection and testing personnel 6.1 General 6.2 Assignment to safety classes |
30 | 6.3 Requirements to be met by the adhesively bonded joints 6.4 Design of adhesively bonded joints 6.5 Adherends 6.6 Adhesive |
31 | 6.7 Surface treatment 6.8 Factors affecting the adhesive bonding process 6.9 Verification 6.9.1 General 6.9.2 Method 1 — Load in use < maximum load capacity |
32 | 6.9.3 Method 2 — Component testing 6.9.4 Method 3 — Documented experience 6.9.5 Method 4 — Combination of methods 1 to 3 7.1 General |
33 | 7.2 Subcontracting (Outsourcing) 7.2.1 General |
34 | 7.2.2 Deciding on subcontracting 7.2.3 Details and documentation of procurement 7.2.4 Selection of external service provider (subcontractor/supplier) and contracting |
35 | 7.2.5 Management of external service providers (subcontractors/suppliers) 8.1 General 8.2 General process requirements 8.2.1 Production planning 8.2.2 Process design |
36 | 8.2.3 Planning the use of production aids and tools |
37 | 8.2.4 Production documents 8.2.5 Process approval 8.2.6 Transport, storage and logistics for adhesives, auxiliary materials and adherends |
38 | 8.2.7 Production environment |
39 | 8.2.8 Materials 8.2.9 Preparation of work stations and acclimatization of materials |
40 | 8.2.10 Health and safety and environmental protection 8.2.11 Checking for fitting accuracy concerning shape, position and dimension 8.2.12 Checks prior to start of production |
41 | 8.2.13 Treatment of the adherend surfaces |
42 | 8.2.14 Dosing, mixing and application |
43 | 8.2.15 Inspection and testing during adhesive bonding and adhesive solidification 8.2.16 Joining the adherends |
44 | 8.2.17 Fixing 8.2.18 Solidification of the adhesive |
45 | 8.2.19 Inspection and testing of finished components 8.2.20 Packaging and transport of adhesively bonded components 8.3 Work instructions: minimum requirements |
47 | 8.4 Process reliability 8.4.1 General 8.4.2 Quality planning 8.4.3 Control of planning and manufacturing documents 8.4.4 Process validation |
48 | 8.4.5 Production-accompanying work samples as proof of application quality |
49 | 8.4.6 Quality control of process reliability/traceability |
50 | 8.4.7 Instruction of adhesive bonding personnel (ABP) 8.4.8 Post-adhesive bonding finishing 8.5 Rework 8.6 Quality assurance 8.6.1 General 8.6.2 Quality planning |
51 | 8.6.3 Quality inspection 8.6.4 Action in the case of deviations |
52 | 8.6.5 Monitoring of measuring and test equipment and of production aids and tools 8.6.6 Imperfections in adhesively bonded joints |
53 | 8.6.7 Control of non-conforming products 8.6.8 Preventive and corrective action 9.1 General 9.2 Planning of maintenance and repair |
54 | 9.3 Maintenance and repair instructions 9.4 Performing maintenance work/execution rules |
55 | 9.5 Documentation 9.6 Sub-contracting |