BS IEC/IEEE 63198-2775:2023
$215.11
Technical guidelines for smart hydroelectric power plant
Published By | Publication Date | Number of Pages |
BSI | 2023 | 78 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
4 | English CONTENTS |
7 | FOREWORD |
9 | INTRODUCTION |
10 | 1 Scope 2 Normative references 3 Terms and definitions |
13 | 4 General principles |
14 | 5 System architecture 5.1 Architecture model |
15 | Figures Figure 1 – System architecture model of a smart hydroelectric power plant |
16 | 5.2 Logical architecture 5.2.1 Overview |
17 | Figure 2 – Typical system logic architecture of a smart hydroelectric power plant |
18 | 5.2.2 Description of levels and zones |
19 | 5.3 Information model |
20 | 5.4 Network structure 5.4.1 General 5.4.2 Network structure of plant level and group-of-plants level |
21 | Figure 3 – Typical physical structure of plant level and group-of-plants level of a smart hydroelectric power plant |
22 | 5.4.3 Network structure of unit level and process level |
23 | Figure 4 – Typical network structure schematic diagram of process level and unit level |
24 | 5.4.4 Variants for the network structure |
25 | Figure 5 – Recommended communication network structures (Variant A) |
26 | Figure 6 – Recommended communication network structures (Variant B) |
27 | Figure 7 – Recommended communication network structures (Variant C) |
28 | 5.4.5 Network configuration of retrofit engineering Figure 8 – Recommended communication network structures (Variant D) |
29 | 5.4.6 External communication interfaces 6 Basic support system 6.1 Overview Figure 9 – Example of external interfaces of a smart hydroelectric power plant |
30 | 6.2 Time synchronization system 6.3 Power supply system 6.4 CCTV system |
31 | 6.5 Firefighting system 6.6 Access control system 6.7 Large screen display system |
32 | 7 Smart transducer 7.1 Overview 7.2 General technical requirements |
33 | 7.3 Structure of smart transducers Figure 10 – Structure of smart transducers |
34 | Figure 11 – Adaption of conventional transducers |
35 | 8 Functional requirements of IEDs 8.1 Overview 8.2 General technical requirements |
36 | 8.3 Measurement and control 8.3.1 Data acquisition and control execution 8.3.2 Local control |
37 | 8.3.3 Synchronization 8.3.4 Governor |
38 | 8.3.5 Excitation 8.3.6 Speed measurement |
39 | 8.4 Monitoring 8.4.1 Unit online monitoring 8.4.2 Online monitoring of transmission and transformation equipment |
40 | 8.4.3 Hydrology telemetry 8.4.4 Meteorological information acquisition |
41 | 8.4.5 Dam safety monitoring 8.5 Protection 8.5.1 Overview 8.5.2 Electrical protection |
42 | 8.5.3 Mechanical protection |
43 | 9 Platform and intelligent application 9.1 General 9.2 Integrated control and management platform 9.2.1 General 9.2.2 Data management Figure 12 – Functional architecture of ICAMP |
45 | 9.2.3 Basic service |
48 | 9.2.4 Basic applications |
50 | 9.3 Intelligent applications 9.3.1 Hydroelectric power plant economic operation |
54 | 9.3.2 Decision support for Condition-Based Maintenance (CBM) |
56 | 9.3.3 Dam safety analysis and evaluation 9.3.4 Security and safety interaction |
57 | 9.3.5 Plant environment monitoring |
58 | 9.3.6 Intelligent patrol |
59 | 9.3.7 Operation and maintenance simulation |
60 | 9.3.8 Intelligent alarm |
61 | 9.3.9 Intelligent work sheet and operation sheet 9.3.10 Data analysis and trend forecast |
63 | 9.3.11 Emergency command support |
65 | 10 Cyber security 10.1 General 10.2 Network structure security |
66 | Figure 13 – Recommended network architecture |
67 | 10.3 Data and communication security |
68 | Figure 14 – Security categories, typical attacks, and countermeasures Figure 15 – Correlations between IEC 62351 series and IEC TC57 profile standards |
69 | 10.4 Device and software security |
70 | 10.5 Access control 10.6 IT infrastructure comprehensive supervision and management |
71 | 10.7 Audit and modification 10.8 Emergency plan and response 10.9 Employee training and awareness 11 Commissioning, operation and maintenance 11.1 Commissioning 11.1.1 Overview |
72 | 11.1.2 Testing scene management 11.1.3 Testing strategy management 11.1.4 Automatic testing execution 11.1.5 Testing record management 11.2 Operation and maintenance 11.2.1 Remote diagnosis 11.2.2 Product maintenance |
73 | 11.2.3 Documents management 12 Implementation procedures of a smart hydroelectric power plant |
74 | Figure 16 – Typical implementation procedures of a smart hydroelectric power plant |
75 | Bibliography |