BSI PD IEC TR 63214:2019
$102.76
Nuclear power plants. Control rooms. Human factors engineering
Published By | Publication Date | Number of Pages |
BSI | 2019 | 22 |
This document provides a summary of arguments and a technical basis for the development of a new Human Factors Engineering IEC standard and the alignment of IEC 60964. Based on the provided argumentation, the participating members will vote for such an approach. The proposed content of the new standard provides the basis for fruitful discussion within IEC SC 45A WG 8 and raises interest in the development of the new standard.
The scope of the new HFE IEC standard will follow a holistic approach towards the design of the plant-wide control rooms and all HMI, including e.g. the local control stations located throughout the plant. The general principle is to consider the complete nuclear installation design as a sociotechnical system, in a holistic and integrated way.
This document is organized as follows:
-
Clause 5 addresses the open points that serve as a basis for the discussion about a new Human Factors standard within IEC.
-
Clause 6 proposes a basic structure for the new standard to clearly identify the scope of this development.
-
Clause 7 addresses the changes needed to existing IEC standards to be aligned with a new Human Factors standard.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
4 | CONTENTS |
5 | FOREWORD |
7 | INTRODUCTION |
9 | 1 Scope 2 Normative references |
10 | 3 Terms and definitions |
11 | 4 Abbreviated terms |
12 | 5 Identified open points in IEC 60964 concerning HFE 5.1 General 5.2 Limitation of scope 5.3 Supplementary information |
13 | 5.4 Missing information 5.5 Outdated information |
14 | 5.6 Industry needs 6 Directions for the new human factors IEC standards 6.1 General |
15 | 6.2 Proposed “Table of contents” for a new Human Factors Engineering standard |
16 | 6.3 Graphic to guide the design |
17 | 7 Impact on other IEC standards 7.1 General 7.2 IEC 60964:2009 Control Room Design Figure 1 – Human Factors Engineering Process (to be discussed) Figure 2 – New WG 8 document structure (to be discussed) |
18 | 7.3 IEC 60965 Supplementary Control Room 7.4 Series of Control Room Design IEC standards 7.5 Other IEC standards referencing IEC 60964 8 Ongoing discussions concerning the HFE standard 8.1 General 8.2 Topics to be discussed during the standard development 8.3 References to be considered during the standard development |
19 | 9 Conclusion |
20 | Bibliography |