Shopping Cart

No products in the cart.

IEEE STD C62.11 2005:2006 Edition

$40.30

IEEE Standard for Metal-Oxide Surge Arresters for AC Power Circuits (>1 kV)

Published By Publication Date Number of Pages
IEEE 2006 86
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
1 IEEE Std C62.11-2005_Front Cover
IEEE Std C62.11-2005_Front Cover
3 IEEE Standard for Metal-Oxide Surge Arresters for AC Power Circuits (>1 kV)
IEEE Standard for Metal-Oxide Surge Arresters for AC Power Circuits (>1 kV)
6 Introduction
Introduction
Notice to users
Notice to users
Errata
Errata
Interpretations
Interpretations
7 Patents
Patents
Participants
Participants
9 Contents
Contents
11 IEEE Standard for Metal-Oxide Surge Arresters for AC Power Circuits (>1 kV)
IEEE Standard for Metal-Oxide Surge Arresters for AC Power Circuits (>1 kV)
1. Scope
1. Scope
2. Normative references
2. Normative references
13 3. Definitions
3. Definitions
19 4. Service conditions
4. Service conditions
4.1 Usual service conditions
4.1 Usual service conditions
4.1.1 Physical conditions
4.1.1 Physical conditions
4.1.2 System conditions
4.1.2 System conditions
4.2 Unusual service conditions
4.2 Unusual service conditions
4.2.1 Physical conditions
4.2.1 Physical conditions
20 4.2.2 System conditions
4.2.2 System conditions
5. Standard voltage ratings: duty-cycle voltage and maximum continuous operating voltage (MCOV)
5. Standard voltage ratings: duty-cycle voltage and maximum continuous operating voltage (MCOV)
21 6. Performance characteristics and tests
6. Performance characteristics and tests
22 7. Test requirements
7. Test requirements
7.1 Complete arrester test samples
7.1 Complete arrester test samples
23 7.2 Prorated section
7.2 Prorated section
7.2.1 Prorating for discharge voltage tests
7.2.1 Prorating for discharge voltage tests
7.2.2 Prorating for design tests involving demonstration of thermal recovery
7.2.2 Prorating for design tests involving demonstration of thermal recovery
26 7.3 Test measurements
7.3 Test measurements
7.4 Impulse test-wave tolerances
7.4 Impulse test-wave tolerances
27 7.5 Power-frequency test voltages
7.5 Power-frequency test voltages
8. Design tests
8. Design tests
8.1 Arrester insulation withstand test
8.1 Arrester insulation withstand test
8.1.1 Samples
8.1.1 Samples
8.1.2 Procedure
8.1.2 Procedure
29 8.1.3 Evaluation
8.1.3 Evaluation
8.2 Power-frequency sparkover test
8.2 Power-frequency sparkover test
30 8.2.1 Samples
8.2.1 Samples
8.2.2 Procedure
8.2.2 Procedure
8.2.3 Evaluation
8.2.3 Evaluation
8.3 Discharge-voltage characteristics test
8.3 Discharge-voltage characteristics test
8.3.1 Samples
8.3.1 Samples
8.3.2 Procedure
8.3.2 Procedure
32 8.3.3 Evaluation
8.3.3 Evaluation
8.4 Impulse protective level voltage-time characteristic test
8.4 Impulse protective level voltage-time characteristic test
8.4.1 Samples
8.4.1 Samples
8.4.2 Procedure
8.4.2 Procedure
35 8.4.3 Evaluation
8.4.3 Evaluation
8.5 Accelerated aging procedure
8.5 Accelerated aging procedure
36 8.5.1 Samples
8.5.1 Samples
8.5.2 Procedure
8.5.2 Procedure
37 8.5.3 Evaluation
8.5.3 Evaluation
8.6 Accelerated aging test of polymer-housed distribution arresters with exposure to light and electrical stress
8.6 Accelerated aging test of polymer-housed distribution arresters with exposure to light and electrical stress
8.6.1 Accelerated aging by exposure to light
8.6.1 Accelerated aging by exposure to light
8.6.2 Accelerated aging by exposure to electrical stress
8.6.2 Accelerated aging by exposure to electrical stress
39 8.7 Accelerated aging test of polymer-housed arresters with exposure to salt fog
8.7 Accelerated aging test of polymer-housed arresters with exposure to salt fog
8.7.1 Samples
8.7.1 Samples
8.7.2 Initial measurements
8.7.2 Initial measurements
8.7.3 Procedure
8.7.3 Procedure
40 8.7.4 Evaluation
8.7.4 Evaluation
8.8 Contamination test
8.8 Contamination test
8.8.1 Samples
8.8.1 Samples
41 8.8.2 Procedure
8.8.2 Procedure
42 8.8.3 Evaluation
8.8.3 Evaluation
8.9 Distribution arrester seal integrity design test
8.9 Distribution arrester seal integrity design test
8.9.1 Samples
8.9.1 Samples
8.9.2 Initial measurements
8.9.2 Initial measurements
8.9.3 Procedure
8.9.3 Procedure
43 8.9.4 Evaluation
8.9.4 Evaluation
8.10 Radio-influence voltage (RIV) test
8.10 Radio-influence voltage (RIV) test
8.10.1 Samples
8.10.1 Samples
44 8.10.2 Procedure
8.10.2 Procedure
8.10.3 Evaluation
8.10.3 Evaluation
8.11 Partial discharge (PD) test
8.11 Partial discharge (PD) test
8.11.1 Samples
8.11.1 Samples
8.11.2 Procedure
8.11.2 Procedure
8.11.3 Evaluation
8.11.3 Evaluation
8.12 High-current short-duration withstand test
8.12 High-current short-duration withstand test
45 8.12.1 Samples
8.12.1 Samples
8.12.2 Procedure
8.12.2 Procedure
8.12.3 Evaluation
8.12.3 Evaluation
8.13 Low-current long-duration withstand test
8.13 Low-current long-duration withstand test
46 8.13.1 Transmission-line discharge test for station and intermediate arresters
8.13.1 Transmission-line discharge test for station and intermediate arresters
50 8.13.2 Low-current long-duration test for distribution arresters
8.13.2 Low-current long-duration test for distribution arresters
51 8.14 Duty-cycle test
8.14 Duty-cycle test
8.14.1 Samples
8.14.1 Samples
8.14.2 Initial measurements
8.14.2 Initial measurements
8.14.3 Procedure
8.14.3 Procedure
52 8.14.4 Evaluation
8.14.4 Evaluation
8.15 Temporary overvoltage (TOV) test
8.15 Temporary overvoltage (TOV) test
8.15.1 Samples
8.15.1 Samples
8.15.2 Initial measurements
8.15.2 Initial measurements
53 8.15.3 Procedure
8.15.3 Procedure
54 8.15.4 Evaluation
8.15.4 Evaluation
8.16 Pressure-relief test for station and intermediate arresters
8.16 Pressure-relief test for station and intermediate arresters
8.16.1 Samples
8.16.1 Samples
55 8.16.2 Procedure
8.16.2 Procedure
57 8.16.3 Evaluation
8.16.3 Evaluation
8.17 Short-circuit test for porcelain-housed distribution arresters
8.17 Short-circuit test for porcelain-housed distribution arresters
8.17.1 Samples
8.17.1 Samples
58 8.17.2 Procedure
8.17.2 Procedure
59 8.17.3 Evaluation
8.17.3 Evaluation
8.18 Short-circuit test for polymer-housed distribution arresters
8.18 Short-circuit test for polymer-housed distribution arresters
8.18.1 Samples
8.18.1 Samples
60 8.18.2 Procedure
8.18.2 Procedure
62 8.18.3 Evaluation
8.18.3 Evaluation
8.19 Failure mode test for liquid-immersed arresters
8.19 Failure mode test for liquid-immersed arresters
8.19.1 Samples
8.19.1 Samples
63 8.19.2 Procedure
8.19.2 Procedure
8.19.3 Evaluation
8.19.3 Evaluation
8.20 Deadfront arrester failure mode test
8.20 Deadfront arrester failure mode test
64 8.20.1 Samples
8.20.1 Samples
8.20.2 Procedure
8.20.2 Procedure
8.20.3 Evaluation
8.20.3 Evaluation
8.21 Distribution arrester disconnector test
8.21 Distribution arrester disconnector test
8.21.1 Samples
8.21.1 Samples
65 8.21.2 Procedure
8.21.2 Procedure
66 8.21.3 Evaluation
8.21.3 Evaluation
8.22 Maximum design cantilever load (MDCL) and moisture ingress test for polymer-housed arresters
8.22 Maximum design cantilever load (MDCL) and moisture ingress test for polymer-housed arresters
67 8.22.1 Samples
8.22.1 Samples
8.22.2 Initial measurements
8.22.2 Initial measurements
68 8.22.3 Procedure
8.22.3 Procedure
71 8.22.4 Evaluation
8.22.4 Evaluation
72 8.23 Ultimate mechanical strength-static (UMS-static) test for porcelain-housed arresters
8.23 Ultimate mechanical strength-static (UMS-static) test for porcelain-housed arresters
8.23.1 Samples
8.23.1 Samples
8.23.2 Procedure
8.23.2 Procedure
8.23.3 Evaluation
8.23.3 Evaluation
9. Conformance tests
9. Conformance tests
9.1 Power-frequency sparkover test
9.1 Power-frequency sparkover test
9.2 Front-of-wave impulse protective level
9.2 Front-of-wave impulse protective level
73 9.3 Discharge-voltage test
9.3 Discharge-voltage test
9.4 RIV test
9.4 RIV test
10. Construction
10. Construction
10.1 Identification data
10.1 Identification data
10.2 Standard mountings
10.2 Standard mountings
74 10.2.1 Station and intermediate arresters
10.2.1 Station and intermediate arresters
10.2.2 Distribution arresters
10.2.2 Distribution arresters
10.3 Iron and steel parts
10.3 Iron and steel parts
10.4 Terminal connections
10.4 Terminal connections
10.4.1 Station and intermediate class arresters
10.4.1 Station and intermediate class arresters
10.4.2 Distribution arresters
10.4.2 Distribution arresters
10.5 Housing leakage distance
10.5 Housing leakage distance
75 11. Protective characteristics
11. Protective characteristics
12. Certification test procedures for arresters applied to unit substations
12. Certification test procedures for arresters applied to unit substations
12.1 General
12.1 General
12.2 Tests
12.2 Tests
12.2.1 Discharge voltage
12.2.1 Discharge voltage
76 12.2.2 Duty-cycle tests
12.2.2 Duty-cycle tests
12.2.3 High-current short-duration test
12.2.3 High-current short-duration test
12.3 Evaluation procedure
12.3 Evaluation procedure
12.4 Certification
12.4 Certification
12.5 Production monitoring and product retest requirements
12.5 Production monitoring and product retest requirements
12.5.1 General
12.5.1 General
12.5.2 Production monitoring
12.5.2 Production monitoring
12.5.3 Product retest requirements
12.5.3 Product retest requirements
77 13. Routine tests
13. Routine tests
13.1 Current sharing test
13.1 Current sharing test
13.1.1 Current measurements
13.1.1 Current measurements
78 13.1.2 Voltage measurements
13.1.2 Voltage measurements
13.2 Discharge-voltage test
13.2 Discharge-voltage test
13.3 PD test
13.3 PD test
13.4 Seal test
13.4 Seal test
79 13.5 Power-frequency test
13.5 Power-frequency test
13.6 Power-frequency sparkover
13.6 Power-frequency sparkover
80 Annex A (informative) Basis for accelerated aging procedure
Annex A (informative) Basis for accelerated aging procedure
82 Annex B (informative) Surge arrester classification prescribed test requirements
Annex B (informative) Surge arrester classification prescribed test requirements
83 Annex C (informative) Accelerated aging tests for polymer-housed arresters
Annex C (informative) Accelerated aging tests for polymer-housed arresters
C.1 Samples
C.1 Samples
C.2 Initial measurements
C.2 Initial measurements
C.3 Procedure
C.3 Procedure
86 C.4 Evaluation
C.4 Evaluation
IEEE STD C62.11 2005
$40.30