RI SwimingPoolSpaCode 2019 1stptg
$47.13
Rhode Island Swimming Pool and Spa Code, 1st Printing
Published By | Publication Date | Number of Pages |
RI | 2019 | 111 |
This is a fully integrated code based on the 2015 ISPSC.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | 2019 RHODE ISLAND SWIMMING POOL AND SPA CODE |
2 | 2019 RHODE ISLAND SWIMMING POOL AND SPA CODE BASED ON THE 2015 INTERNATIONAL SWIMMING POOL AND SPA CODEยฎ TITLE PAGE |
3 | COPYRIGHT |
4 | PREFACE |
8 | EFFECTIVE USE OF THE INTERNATIONAL SWIMMING POOL AND SPA CODE |
12 | LEGISLATION |
14 | RHODE ISLAND STATE BUILDING CODE SBC-14 STATE SWIMMING POOL AND SPA CODE |
15 | REGULATION SBC-14 RHODE ISLAND SWIMMING POOL AND SPA CODE 2019 AUGUST 1, 2019 |
16 | STATE OF RHODE ISLAND BUILDING CODE STANDARDS COMMITTEE |
17 | STATE BUILDING CODE REGULATIONS โ 2016 |
18 | TABLE OF CONTENTS |
20 | CHAPTER 23โ27.3 STATE BUILDING CODE ยง 23-27.3-100.0 SCOPE ยง 23-27.3-100.1 SHORT TITLE – APPLICABILITY ยง 23-27.3-100.1.1 CHAPTER TITLE – APPLICABILITY ยง 23-27.3-100.1.2 PURPOSE ยง 23-27.3-100.1.3 CREATION OF THE STATE BUILDING CODE STANDARDS COMMITTEE |
21 | ยง 23-27.3-100.1.4 APPOINTMENT AND QUALIFICATIONS OF THE COMMITTEE ยง 23-27.3-100.1.5 BUILDING CODE – ADOPTION AND PROMULGATION BY COMMITTEE |
22 | ยง 23-27.3-100.1.5.1 HOUSING AND MAINTENANCE CODE ยง 23-27.3-100.1.5.2 EXISTING CODES ยง 23-27.3-100.1.5.3 STATE REHABILITATION BUILDING AND FIRE CODE FOR EXISTING BUILDINGS AND STRUCTURES ยง 23-27.3-100.1.5.4 STATE ENERGY CONSERVATION CODE |
23 | ยง 23-27.3-100.1.5.5 HURRICANE, STORM AND FLOOD STANDARDS ยง 23-27.3-100.1.6 COMMITTEE AS BOARD OF STANDARDS AND APPEALS – POWERS AND DUTIES – APPEALS ยง 23-27.3-100.1.7 EFFECT OF LOCAL CODES – REPEAL OF LOCAL AUTHORITY ยง 23-27.3-100.1.8 SEVERABILITY ยง 23-27.3-100.2 APPLICATION OF REFERENCES ยง 23-27.3-100.3 CONSTRUCTION ยง 23-27.3-100.4 SPECIALIZED CODES INCORPORATED |
24 | ยง 23-27.3-101.0 MATTERS COVERED ยง 23-27.3-101.1 EXEMPTION FOR ORDINARY REPAIRS ยง 23-27.3-101.2 MATTERS NOT COVERED ยง 23-27.3-101.2.1 PROPOSED BUILDINGS ยง 23-27.3-101.2.2 BUILDINGS AND STRUCTURES, EXISTING AND UNDER CONSTRUCTION ยง 23-27.3-101.3 ZONING RESTRICTIONS ยง 23-27.3-102.0 ORDINARY REPAIRS ยง 23-27.3-103.0 INSTALLATION OF SERVICE EQUIPMENT ยง 23-27.3-104.0 MAINTENANCE |
25 | ยง 23-27.3-104.1 OWNER RESPONSIBILITY ยง 23-27.3-105.0 CHANGE IN EXISTING USE ยง 23-27.3-105.1 CONTINUATION OF EXISTING USE ยง 23-27.3-105.2 CHANGE IN USE AND OCCUPANCY ยง 23-27.3-105.3 PART CHANGE IN USE ยง 23-27.3-105.4 REESTABLISHMENT OF A PRIOR USE ยง 23-27.3-106.0 EXISTING STRUCTURES ยง 23-27.3-106.1 SUBSTANTIAL IMPROVEMENTS ยง 23-27.3-106.2 SUBSTANTIAL DAMAGES EXCEEDING FIFTY PERCENT |
26 | ยง 23-27.3-106.3 IMPROVEMENTS AND DAMAGES BETWEEN TWENTY-FIVE AND FIFTY PERCENT OF VALUE ยง 23-27.3-106.4 IMPROVEMENTS OR DAMAGES UNDER TWENTY-FIVE PERCENT OF VALUE ยง 23-27.3-106.5 PHYSICAL VALUE ยง 23-27.3-107.0 DEPARTMENT OF BUILDING INSPECTION ยง 23-27.3-107.1 LOCAL BUILDING OFFICIAL – APPOINTMENT ยง 23-27.3-107.1.1 LOCAL INSPECTOR – ยง 23-27.3-107.2 ALTERNATE LOCAL BUILDING OFFICIAL |
27 | ยง 23-27.3-107.3 APPOINTMENT OF PERSONNEL BY STATE BUILDING COMMISSIONER ยง 23-27.3-107.4 QUALIFICATIONS AND DUTIES OF THE STATE BUILDING COMMISSIONER ยง 23-27.3-107.5 LOCAL BUILDING OFFICIAL – QUALIFICATIONS – POWERS AND DUTIES ยง 23-27.3-107.6 CERTIFICATION OF LOCAL BUILDING OFFICIALS – EDUCATIONAL PROGRAMS |
28 | ยง 23-27.3-107.7 RECERTIFICATION AND CONTINUING EDUCATION ยง 23-27.3-107.8 RESTRICTION ON EMPLOYEES’ ACTIVITIES ยง 23-27.3-107.9 RELIEF FROM PERSONAL RESPONSIBILITY ยง 23-27.3-108.0 DUTIES AND POWERS OF THE BUILDING OFFICIAL AND THE STATE BUILDING COMMISSIONER ยง 23-27.3-108.1 LOCAL BUILDING OFFICIAL – ENFORCEMENT DUTIES ยง 23-27.3-108.1.1 APPLICATIONS AND PERMITS ยง 23-27.3-108.1.3 NEW MATERIALS AND METHODS OF CONSTRUCTION |
29 | ยง 23-27.3-108.1.3.1 TEST RESULTS ยง 23-27.3-108.1.3.2 RETESTING ยง 23-27.3-108.1.4 INSPECTIONS ยง 23-27.3-108.1.5 REPEALED ยง 23-27.3-108.1.6 ADMINISTRATIVE PROCEDURES ยง 23-27.3-108.1.7 DEPARTMENT RECORDS ยง 23-27.3-108.1.8 REPORTS ยง 23-27.3-108.2 STATE BUILDING COMMISSIONER’S DUTIES |
30 | ยง 23-27.3-108.2.0.1 REPEALED ยง 23-27.3-108.2.1 DUTIES OF COMMITTEE ยง 23-27.3-108.2.2 COMPENSATION OF COMMITTEE MEMBERS ยง 23-27.3-108.2.3 EMERGENCY PROCEDURES ยง 23-27.3-108.2.4 MUNICIPAL ADVISORY COUNCIL ON STATEWIDE PERMITTING ยง 23-27.3-109.0 COMMITTEE ยง 23-27.3-109.1 COMMITTEE’S RULE MAKING AUTHORITY – LEGISLATIVE REPORT – LEGISLATIVE COMMITTEE |
31 | ยง 23-27.3-109.1.1 COMMITTEE – LICENSING OF LABORATORIES AND TEST PERSONNEL ยง 23-27.3-109.1.2 COMMITTEE – REGULATION OF MANUFACTURED BUILDINGS ยง 23-27.3-109.1.3 ADOPTION OF FEDERAL STANDARDS FOR MANUFACTURED HOMES ยง 23-27.3-109.1.3.1 INSPECTION OF MANUFACTURED HOMES MANUFACTURERS ยง 23-27.3-109.1.3.2 PENALTIES FOR VIOLATION AS TO MANUFACTURED HOMES |
32 | ยง 23-27.3-109.1.3.3 MONITORING INSPECTION FEE ยง 23-27.3-109.1.3.4 REPORTS OF MANUFACTURED HOME MANUFACTURERS, DISTRIBUTORS, AND DEALERS ยง 23-27.3-109.1.3.5 TEMPORARY GREENHOUSE DEFINED ยง 23-27.3-109.1.4 REPEALED ยง 23-27.3-109.2 ACCEPTED ENGINEERING PRACTICE ยง 23-27.3-109.3 PROPOSING AMENDMENTS TO RULES AND REGULATIONS ยง 23-27.3-110.0 MODIFICATIONS AND VARIANCES ยง 23-27.3-111.0 NEW AND ALTERED BUILDING AND STRUCTURE – INSPECTIONS ยง 23-27.3-111.1 PRELIMINARY INSPECTION ยง 23-27.3-111.2 INSPECTION |
33 | ยง 23-27.3-111.3 MANUFACTURING BUILDINGS ยง 23-27.3-111.3.1 PLANT INSPECTION ยง 23-27.3-111.3.2 INSTALLATION SITE INSPECTION ยง 23-27.3-111.4 EXISTING BUILDINGS ยง 23-27.3-111.4.1 PERIODIC INSPECTIONS ยง 23-27.3-111.4.2 REPEALED – ยง 23-27.3-111.5 FINAL INSPECTION ยง 23-27.3-111.6 INSPECTION SERVICES ยง 23-27.3-111.7 COORDINATION OF INSPECTIONS ยง 23-27.3-112.0 RIGHT OF ENTRY ยง 23-27.3-112.1 OFFICIAL IDENTIFICATION CARD |
34 | ยง 23-27.3-112.2 MUNICIPAL COOPERATION ยง 23-27.3-113.0 APPLICATION FOR PERMIT ยง 23-27.3-113.1 WHEN PERMIT IS REQUIRED ยง 23-27.3-113.1.1 ISSUANCE OF PERMITS FOR SIDING ยง 23-27.3-113.2 FORM OF APPLICATION – ยง 23-27.3-113.3 BY WHOM APPLICATION IS MADE – ยง 23-27.3-113.3.1 APPLICATIONS FOR WORK REQUIRING LICENSED WORKERS ยง 23-27.3-113.3.2 APPLICATIONS FOR WORK REQUIRING REGISTERED WORKERS |
35 | ยง 23-27.3-113.4 DESCRIPTION OF WORK ยง 23-27.3-113.5 PLANS AND SPECIFICATIONS ยง 23-27.3-113.5.1 REPEALED ยง 23-27.3-113.6 PLOT PLAN ยง 23-27.3-113.6.1 APPROVLA OF AN INDIVIDUAL SEWAGE DISPOSAL SYSTEM ยง 23-27.3-113.7 ENGINEERING DETAILS ยง 23-27.3-113.8 AMENDMENTS TO APPLICATION ยง 23-27.3-113.9 TIME LIMITATION ON APPLICATION ยง 23-27.3-114.0 PERMITS ยง 23-27.3-114.1 ACTION ON APPLICATION |
36 | ยง 23-27.3-114.1.1 REPORTS TO ASSESSORS ยง 23-27.3-114.2 EXPIRATON OF PERMIT ยง 23-27.3-114.3 PREVIOUS APPROVALS |
37 | ยง 23-27.3-114.3.1 DRAWINGS AND SPECIFICATIONS ยง 23-27.3-114.4 BUILDING OFFICIAL TO SIGN PERMIT ยง 23-27.3-114.5 APPROVED PLANS ยง 23-27.3-114.6 REVOCATION OF PERMITS ยง 23-27.3-114.7 APPROVAL IN PART ยง 23-27.3-114.8 POSTING OF PERMIT ยง 23-27.3-114.9 NOTICE OF BUILDING START ยง 23-27.3-115.0 CONDITIONS OF PERMIT ยง 23-27.3-115.1 COMPLIANCE WITH CODE ยง 23-27.3-115.2 COMPLIANCE WITH PERMIT ยง 23-27.3-115.3 COMPLIANCE WITH PLOT PLAN ยง 23-27.3-115.4 CHANGE IN PLOT PLAN |
38 | ยง 23-27.3-115.5 DISMISSAL OF CONTRACTOR OR SUBCONTRACTOR ยง 23-27.3-116.0 MOVING, RAISING, SHORING, OR DEMOLITION OF BUILDINGS ยง 23-27.3-116.1 SERVICE CONNECTIONS ยง 23-27.3-116.2 BUILDINGS TO BE RODENT-ERADICATED PRIOR TO DEMOLITION ยง 23-27.3-116.3 DESCRIPTION AND INSPECTION OF BUILDINGS – TRAVEL ROUTE ยง 23-27.3-116.4 AGREEMENT CONDITION TO MOVING ยง 23-27.3-116.5 PUBLIC UTILITIES, WIRES, POLES, TREES, AND SHRUBS ยง 23-27.3-116.6 MOVING TO BE CONTINUOUS ยง 23-27.3-116.7 WATCHPERSON AND LIGHTS DURING MOVING |
39 | ยง 23-27.3-116.8 BONDS AND LIABILITY INSURANCE ยง 23-27.3-116.9 SHORING ยง 23-27.3-117.0 REMOVAL OF STRUCTURES ยง 23-27.3-117.1 LOT REGULATION ยง 23-27.3-118.0 FEES ยง 23-27.3-118.1 SPECIAL FEES ยง 23-27.3-118.2 RAMPS FOR DISABLED PERSONS ยง 23-27.3-119.0 FEE COMPUTATION ยง 23-27.3-120.0 CERTIFICATE OF USE AND OCCUPANCY ยง 23-27.3-120.1 NEW BUILDINGS ยง 23-27.3-120.2 BUILDINGS HEREAFTER ALTERED |
40 | ยง 23-27.3-120.3 EXISTING BUILDINGS ยง 23-27.3-120.4 CHANGES IN USE AND OCCUPANCY ยง 23-27.3-120.5 TEMPORARY OCCUPANCY ยง 23-27.3-120.6 CONTENTS OF CERTIFICATE ยง 23-27.3-121.0 POSTING BUILDINGS ยง 23-27.3-121.1 POSTED USE AND OCCUPANCY |
41 | ยง 23-27.3-121.2 POSTED OCCUPANCY LOAD ยง 23-27.3-121.3 FURNISHING OF POSTED SIGNS ยง 23-27.3-121.4 PERIODIC INSPECTION FOR POSTING ยง 23-27.3-122.0 VIOLATIONS ยง 23-27.3-122.1 NOTICE OF VIOLATION ยง 23-27.3-122.1.2 NOTICE OR ORDERS – SERVICE AND CONTENT ยง 23-27.3-122.2 PROSECUTION OF VIOLATION ยง 23-27.3-122.3 PENALTIES ยง 23-27.3-122.4 ABATEMENT OF VIOLATIONS |
42 | ยง 23-27.3-123.0 STOP-WORK ORDER ยง 23-27.3-123.1 NOTICE TO OWNER ยง 23-27.3-123.1.1 POSTING OF ORDER ยง 23-27.3-123.2 UNLAWFUL CONTINUANCE ยง 23-27.3-124.0 UNSAFE STRUCTURES – GENERAL PROVISIONS ยง 23-27.3-124.1 UNSAFE CONDITIONS ยง 23-27.3-124.2 NOTICE OF UNSAFE CONDITION |
43 | ยง 23-27.3-124.3 APPEALS ยง 23-27.3-124.4 RESTORATION OF UNSAFE BUILDINGS ยง 23-27.3-124.4.1 COMPLIANCE ยง 23-27.3-124.5 DISREGARD OF UNSAFE NOTICE ยง 23-27.3-124.6 BOARDING |
44 | ยง 23-27.3-124.6.1 DISCONNECTION OF UTILITIES ยง 23-27.3-124.6.2 REMOVAL OF DEBRIS AND RUBBISH ยง 23-27.3-125.0 EMERGENCY MEASURES ยง 23-27.3-125.1 VACATING BUILDINGS ยง 23-27.3-125.2 TEMPORARY SAFEGUARDS ยง 23-27.3-125.3 CLOSING STREETS ยง 23-27.3-125.4 EMERGENCY REPAIRS ยง 23-27.3-125.5 HAZARDOUS BUILDINGS ยง 23-27.3-125.6 COSTS OF EMERGENCY REPAIRS ยง 23-27.3-125.7 LIEN FOR EMERGENCY REPAIRS ยง 23-27.3-126.0 APPEALS FROM ORDERS IN REGARD TO UNSAFE BUILDINGS |
45 | ยง 23-27.3-126.1 APPLICATION FOR REVIEW ยง 23-27.3-126.2 PROCEDURE ยง 23-27.3-126.3 FINDINGS ยง 23-27.3-127.0 STATE AND LOCAL BOARDS OF APPEALS ยง 23-27.3-127.1 COMMITTEE TO SERVE AS A BOARD OF STANDARDS AND APPEALS |
46 | ยง 23-27.3-127.1.1 STAY OF PROCEEDINGS ยง 23-27.3-127.1.2 GRANTING VARIANCE ยง 23-27.3-127.1.3 ADDITIONAL POWERS ยง 23-27.3-127.1.4 PROCEDURES – RECORD OF VARIANCES |
47 | ยง 23-27.3-127.2 LOCAL BOARD OF APPEALS ยง 23-27.3-127.2.1 MEMBERSHIP AND LOCAL BOARD ยง 23-27.3-127.2.2 STAY OF PROCEEDINGS ยง 23-27.3-127.2.3 GRANTING VARIANCE ยง 23-27.3-127.2.4 ADDITIONAL POWERS ยง 23-27.3-127.2.5 PROCEDURES |
48 | ยง 23-27.3-127.2.6 LOCAL DECISION TRANSMITTED TO STATE BOARD ยง 23-27.3-128.0 DESIGN AND CONSTRUCTION PROCEDURES ยง 23-27.3-128.1 SCOPE ยง 23-27.3-128.1.2 โ 23-27.3-128.1.5 REPEALED ยง 23-27.3-128.2 REPEALED ยง 23-27.3-128.2.1 DRAWINGS AND SPECIFICATIONS ยง 23-27.3-128.2.2 RESPONSIBILITIES |
49 | ยง 23-27.3-128.2.3 REPORTING ยง 23-27.3-128.3 CONSTRUCTION CONTRACTOR RESPONSIBILITIES ยง 23-27.3-128.4 TESTING REQUIRED ยง 23-27.3-128.5 BUILDING OFFICIAL’S RESPONSIBILITIES ยง 23-27.3-128.5.1 WAIVER OF PLAN EXAMINATION ยง 23-27.3-128.5.2 WAIVER OF DETAILED FIELD INSPECTION |
50 | ยง 23-27.3-128.5.3 INSPECTION WAIVER – UTILIZATION ยง 23-27.3-128.5.4 BUILDING PERMIT ISSUANCE OR REQUIREMENTS ยง 23-27.3-128.6 SPECIAL TECHNICAL SERVICES ยง 23-27.3-128.7 FEES AND COSTS ยง 23-27.3-129.0, 23-27.3-129.1 REPEALED ยง 23-27.3-129.2 REPEALED ยง 23-27.3-129.3 REPEALED ยง 23-27.3-200.0 SAVINGS CLAUSE ยง 23-27.3-300.0 PUBLICATION OF CODE ยง 23-27.3-400.0 SEVERABILITY |
51 | ยง 23-27.3-401.0 SALE OF PRESSURE VESSEL ยง 23-27.3-500.0 EFFECTIVE DATE OF CODE ยง 23-27.3-501.0, 23-27.3-502.0 REPEALED ยง 23-27.3-503.0, 23-27.3-504.0 [OBSOLETE] ยง 23-27.3-505.0 REPEALED ยง 23-27.3-506.0 [OBSOLETE] ยง 23-27.3-600.0 FRESH WATER WETLANDS ยง 23-27.3-700.0 REPEALED ยง 23-27.3-701.0 BABY CHANGING TABLES |
52 | CHAPTER 1 SCOPE AND ADMINISTRATION PART 1โSCOPE AND APPLICATION SECTION 101 GENERAL SECTION 102 APPLICABILITY |
53 | PART 2โADMINISTRATION AND ENFORCEMENT SECTION 103 DEPARTMENT OF BUILDING SAFETY SECTION 104 DUTIES AND POWERS OF THE CODE OFFICIAL SECTION 105 PERMITS SECTION 106 INSPECTIONS |
55 | SECTION 107 VIOLATIONS SECTION 108 MEANS OF APPEAL |
56 | CHAPTER 2 DEFINITIONS SECTION 201 GENERAL SECTION 202 DEFINITIONS |
60 | CHAPTER 3 GENERAL COMPLIANCE SECTION 301 GENERAL SECTION 302 ELECTRICAL, PLUMBING, MECHANICAL AND FUEL GAS REQUIREMENTS SECTION 303 ENERGY |
61 | SECTION 304 FLOOD HAZARD AREAS SECTION 305 BARRIER REQUIREMENTS |
63 | SECTION 306 DECKS TABLE 306.5 MINIMUM DRAINAGE SLOPES FOR DECK SURFACES |
64 | SECTION 307 GENERAL DESIGN TABLE 307.4 RESERVOIRS AND SHELLS SECTION 308 DIMENSIONAL DESIGN |
65 | SECTION 309 EQUIPMENT SECTION 310 SUCTION ENTRAPMENT AVOIDANCE SECTION 311 CIRCULATION SYSTEMS TABLE 311.4 CIRCULATION SYSTEM PIPE MATERIAL STANDARD |
66 | TABLE 311.4.1 CIRCULATION SYSTEM FITTINGS SECTION 312 FILTERS SECTION 313 PUMPS AND MOTORS |
67 | SECTION 314 RETURN AND SUCTION FITTINGS SECTION 315 SKIMMERS TABLE 315.3 SKIMMER SIZING TABLE |
68 | SECTION 316 HEATERS TABLE 316.2 WATER HEATERS SECTION 317 AIR BLOWER AND AIR INDUCTION SYSTEM SECTION 318 WATER SUPPLY |
69 | SECTION 319 SANITIZING EQUIPMENT SECTION 320 WASTE WATER DISPOSAL SECTION 321 LIGHTING SECTION 322 LADDERS AND RECESSED TREADS |
70 | FIGURE 322.2 MINIMUM WATER DIVING ENVELOPE SECTION 323 SAFETY |
72 | CHAPTER 4 PUBLIC SWIMMING POOLS SECTION 401 GENERAL TABLE 401.4 CONSTRUCTION TOLERANCES SECTION 402 DIVING |
73 | TABLE 402.12 MINUMUM DIVING WATER ENVELOPES (SEE FIGURE 402.12) FIGURE 402.12 (MINIMUM DIVING WATER ENVELOPES) CONSTRUCTION DIMENSIONS FOR WATER ENVELOPES FOR CLASS B AND CLASS C POOLS |
74 | SECTION 403 BATHER LOAD TABLE 403.1 MAXIMUM BATHER LOAD SECTION 404 REST LEDGES SECTION 405 WADING POOLS SECTION 406 DECKS AND DECK EQUIPMENT |
75 | SECTION 407 CIRCULATION SYSTEMS TABLE 407.2 TURNOVER RATE SECTION 408 FILTERS SECTION 409 SPECIFIC SAFETY FEATURES |
76 | SECTION 410 DRESSING AND SANITARY FACILITIES SECTION 411 SPECIAL FEATURES |
77 | SECTION 412 SIGNAGE FIGURE 412.1 SAFETY SIGN |
78 | CHAPTER 5 PUBLIC SPAS AND PUBLIC EXERCISE SPAS SECTION 501 GENERAL SECTION 502 MATERIALS SECTION 503 STRUCTURE AND DESIGN SECTION 504 PUMPS AND MOTORS SECTION 505 RETURN AND SUCTION FITTINGS SECTION 506 HEATER AND TEMPERATURE REQUIREMENTS |
79 | SECTION 507 WATER SUPPLY SECTION 508 SANITIZING, OXIDATION EQUIPMENT AND CHEMICAL FEEDERS SECTION 509 SAFETY FEATURES |
80 | CHAPTER 6 AQUATIC RECREATION FACILITIES SECTION 601 GENERAL SECTION 602 FLOORS SECTION 603 MARKINGS AND INDICATORS SECTION 604 CIRCULATION SYSTEMS TABLE 604.2 TURNOVER TIME |
81 | TABLE 604.3 SURFACE SKIMMING SYSTEMS SECTION 605 HANDHOLDS AND ROPES SECTION 606 DEPTHS SECTION 607 BARRIERS SECTION 608 NUMBER OF OCCUPANTS TABLE 608.1 OCCUPANT LOAD |
82 | SECTION 609 TOILET ROOMS AND BATHROOMS SECTION 610 SPECIAL FEATURES TABLE 610.1 ENTRY AND EXIT LOCATIONS |
83 | SECTION 611 SIGNAGE |
86 | CHAPTER 7 ONGROUND STORABLE RESIDENTIAL SWIMMING POOLS SECTION 701 GENERAL SECTION 702 LADDERS AND STAIRS FIGURE 702.2 TYPICAL A-FRAME LADDER, TYPES A AND B |
87 | FIGURE 702.3 TYPICAL STAIRCASE LADDER, TYPE C FIGURE 702.4 TYPICAL IN-POOL LADDER, TYPE D |
88 | FIGURE 702.5 TYPICAL IN-POOL STAIRCASE TYPES, E AND F SECTION 703 DECKS |
89 | FIGURE 703.4 TYPICAL CANTILEVERED DECK SUPPORT FIGURE 703.6 WALK-AROUND DECK WIDTH SECTION 704 CIRCULATION SYSTEM |
90 | SECTION 705 SAFETY SIGNS |
92 | CHAPTER 8 PERMANENT INGROUND RESIDENTIAL SWIMMING POOLS SECTION 801 GENERAL SECTION 802 DESIGN SECTION 803 CONSTRUCTION TOLERANCES SECTION 804 DIVING WATER ENVELOPES TABLE 804.1 MININUM DIVING WATER ENVELOPE FOR SWIMMING POOLS DESIGNATED TYPES I-Vb SECTION 805 WALLS SECTION 806 OFFSET LEDGES SECTION 807 POOL FLOORS |
93 | FIGURE 804.1 MINIMUM DIVING WATER ENVELOPE |
94 | SECTION 808 DIVING EQUIPMENT TABLE 808.12 DIVING PLATFORM OR APPURTENANCE HEIGHT ABOVE DESIGN WATERLINE SECTION 809 SPECIAL FEATURES |
95 | SECTION 810 CIRCULATION SYSTEMS SECTION 811 SAFETY FEATURES |
96 | CHAPTER 9 PERMANENT RESIDENTIAL SPAS AND PERMANENT RESIDENTIAL EXERCISE SPAS SECTION 901 GENERAL SECTION 902 SAFETY FEATURES |
98 | CHAPTER 10 PORTABLE RESIDENTIAL SPAS AND PORTABLE RESIDENTIAL EXERCISE SPAS SECTION 1001 GENERAL |
100 | CHAPTER 11 REFERENCED STANDARDS AHRI ANSI APSP ASCE/SEI |
101 | ASME ASTM CPSC |
102 | CSA IAPMO ICC NEMA |
103 | NFPA NSF UL |
104 | INDEX |
108 | ICC SOLAR RATING & CERTIFICATION CORPORATION (ICC-SRCC) |
109 | ICC premiumACCESS |
110 | ICC ASSESSMENT CENTER |
111 | ICC MEMBERSHIP |