WRC volume 51 No. 11-12:1996
$27.95
Progress Reports Volume 51 No. 11-12
Published By | Publication Date | Number of Pages |
WRC | 1996 | 94 |
Contents
This volume includes the full Minutes of the Executive Committee, Design Division and Materials and Fabrication Division. The balance of the PVRC Minutes, including those of the PVRC Steering Committee on Cyclic Live and Environmental Effects, appear in the companion Volume, September/October 1996 Progress Reports.
– Executive Committee, October 9, 1996
– JPVRC Progress Reports
– Joint Task Group on Increased Code Allowable Stresses, October 7, 1996
– Task Group on Inspection Planning, October 7, 1996
– Design Division, October 9, 1996
– Committee on Bolted Flanged Connections, October 7, 1996
– Subcommittee on Flange Parameter Study, October 8, 1996
– Subcommittee on Gasket Testing and Elevated Temperature Flanged Joint Behavior, October 8, 1996
– Committee on Dynamic Analysis and Testing, October 8, 1996
– Subcommittee on Dynamic Stress Criteria, October 7, 1996
– Committee on Elevated Temperature Design, October 8, 1996
– Joint Meeting of Piping and Nozzles and Shells and Ligaments, October 8, 1996
– Subcommittee on Flexibility Models and SIFS, October 7, 1996
– Material and Fabrication Division, October 9, 1996
– Committee on Failure Modes, October 8, 1996
– Committee on Nondestructive Examination, October 8, 1996
– Committee on Welds, October 8, 1996