{"id":28144,"date":"2024-10-17T02:56:34","date_gmt":"2024-10-17T02:56:34","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asce-manual-117-09\/"},"modified":"2024-10-24T14:01:19","modified_gmt":"2024-10-24T14:01:19","slug":"asce-manual-117-09","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asce\/asce-manual-117-09\/","title":{"rendered":"ASCE Manual 117 09"},"content":{"rendered":"

 This manual describes successful construction methods and procedures for installing common types of pipes used to transport water-like fluids. Inspecting Pipeline Installation focuses on the needs of field personnel, constructors, and inspectors. It assumes the pipeline design is complete, decisions on alternatives are resolved, and the designer\u2019s concepts are now ready for conversion to a real project. Pipeline construction is complex and demanding and requires the services of skilled contractors and craftsmen. Construction quality control and assurance are strict job requirements. This manual has two main purposes. First, it provides an educational tool for readers with limited experience. Second, it consolidates a wealth of practical pipeline installation information into one volume. This book covers introductory and advanced topics. It provides guidance for those with limited technical backgrounds, as well as those without specific working knowledge of a variety of pipe materials. Non-technical personnel needing basic information regarding the pipeline installation process will also find the manual useful.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
10<\/td>\nCONTENTS <\/td>\n<\/tr>\n
16<\/td>\n1 INTRODUCTION <\/td>\n<\/tr>\n
17<\/td>\n1.1 Targeted Readership <\/td>\n<\/tr>\n
18<\/td>\n1.2 Terminology <\/td>\n<\/tr>\n
19<\/td>\n1.3 Text Organization
1.4 Emphasis on Construction Practices <\/td>\n<\/tr>\n
20<\/td>\n1.5 Sources of Information <\/td>\n<\/tr>\n
22<\/td>\n2 SOIL MECHANICS FOR PIPELINE CONSTRUCTORS
2.1 Introduction <\/td>\n<\/tr>\n
25<\/td>\n2.2 Natural Soil Components <\/td>\n<\/tr>\n
27<\/td>\n2.3 Describing a Soil Mixture <\/td>\n<\/tr>\n
33<\/td>\n2.4 Groundwater <\/td>\n<\/tr>\n
35<\/td>\n2.5 Loads in a Soil Mass <\/td>\n<\/tr>\n
38<\/td>\n2.6 Soil Compaction <\/td>\n<\/tr>\n
41<\/td>\n2.7 The Geotechnical Report <\/td>\n<\/tr>\n
42<\/td>\n2.8 Pipe Stiffness <\/td>\n<\/tr>\n
44<\/td>\n2.9 Interaction of the Soil and the Pipe Structure <\/td>\n<\/tr>\n
48<\/td>\n3 DESCRIBING COMMON PROCEDURES <\/td>\n<\/tr>\n
50<\/td>\n4 OBTAINING PIPE FROM A SUPPLIER <\/td>\n<\/tr>\n
52<\/td>\n5 MANAGING THE PROJECT <\/td>\n<\/tr>\n
56<\/td>\n6 EXCAVATION AND BACKFILLING
6.1 The Major Common Work <\/td>\n<\/tr>\n
58<\/td>\n6.2 Excavation of a Pipe Trench: The First Phase of Pipeline Earthwork <\/td>\n<\/tr>\n
73<\/td>\n6.3 Other Important Earthwork Decisions <\/td>\n<\/tr>\n
77<\/td>\n6.4 Moving Earth <\/td>\n<\/tr>\n
83<\/td>\n6.5 Embedding the Pipe: The Second Phase of Pipeline Earthwork <\/td>\n<\/tr>\n
89<\/td>\n6.6 Problem Conditions during Backfilling <\/td>\n<\/tr>\n
90<\/td>\n6.7 Completing the Trench: The Third Phase of Pipeline Earthwork <\/td>\n<\/tr>\n
91<\/td>\n6.8 Notes to Inspectors <\/td>\n<\/tr>\n
94<\/td>\n7 PIPE SHIPPING AND HANDLING
7.1 Controlling Pipe Delivery <\/td>\n<\/tr>\n
100<\/td>\n8 GENERAL INSTALLATION FOR ALL PIPES
8.1 Basic Workplace Control <\/td>\n<\/tr>\n
101<\/td>\n8.2 General Pipe Installation
8.3 Handling and Operational Issues <\/td>\n<\/tr>\n
104<\/td>\n8.4 Mainline Connections <\/td>\n<\/tr>\n
105<\/td>\n8.5 Reaction or Thrust Blocking
8.6 Connection to Structures <\/td>\n<\/tr>\n
106<\/td>\n8.7 Installation in Casings and Tunnels <\/td>\n<\/tr>\n
107<\/td>\n8.8 Other Considerations
8.9 Corrosion
8.10 Measurement of Pipe Deformation <\/td>\n<\/tr>\n
108<\/td>\n8.11 First Filling of Pipes <\/td>\n<\/tr>\n
110<\/td>\n9 GENERAL INSTALLATION PROCEDURES <\/td>\n<\/tr>\n
114<\/td>\n10 STEEL PIPE
10.1 General Background and Discussion <\/td>\n<\/tr>\n
116<\/td>\n10.2 Product Information <\/td>\n<\/tr>\n
120<\/td>\n10.3 Linings and Coatings <\/td>\n<\/tr>\n
122<\/td>\n10.4 Pipe Shipping and Handling <\/td>\n<\/tr>\n
123<\/td>\n10.5 Installation <\/td>\n<\/tr>\n
127<\/td>\n10.6 Backfilling <\/td>\n<\/tr>\n
128<\/td>\n10.7 Testing and Acceptance <\/td>\n<\/tr>\n
130<\/td>\n11 CORRUGATED METAL PIPE
11.1 General Background and Discussion <\/td>\n<\/tr>\n
132<\/td>\n11.2 Shipping and Handling <\/td>\n<\/tr>\n
133<\/td>\n11.3 Installation of Corrugated Metal Pipe <\/td>\n<\/tr>\n
136<\/td>\n11.4 Inspection and Testing <\/td>\n<\/tr>\n
138<\/td>\n12 DUCTILE IRON PIPE
12.1 General Background and Discussion <\/td>\n<\/tr>\n
139<\/td>\n12.2 Product Information <\/td>\n<\/tr>\n
142<\/td>\n12.3 A Sample Project to Describe Ductile Iron Pipe Installation <\/td>\n<\/tr>\n
143<\/td>\n12.4 Delivering Pipe to the Job Site <\/td>\n<\/tr>\n
146<\/td>\n12.5 Laying Pipe <\/td>\n<\/tr>\n
151<\/td>\n12.6 Tapping <\/td>\n<\/tr>\n
152<\/td>\n12.7 Connections to Structures
12.8 Installing in Tunnels and Casings <\/td>\n<\/tr>\n
153<\/td>\n12.9 Related Topics <\/td>\n<\/tr>\n
155<\/td>\n12.10 Testing and Acceptance <\/td>\n<\/tr>\n
157<\/td>\n12.11 Record Drawings <\/td>\n<\/tr>\n
158<\/td>\n13 PRESTRESSED CONCRETE CYLINDER PIPE
13.1 General Background and Discussion <\/td>\n<\/tr>\n
160<\/td>\n13.2 Product Information <\/td>\n<\/tr>\n
163<\/td>\n13.3 Linings and Coatings <\/td>\n<\/tr>\n
164<\/td>\n13.4 Shipping and Handling <\/td>\n<\/tr>\n
165<\/td>\n13.5 Installation <\/td>\n<\/tr>\n
172<\/td>\n14 REINFORCED CONCRETE PIPE
14.1 General Background and Discussion <\/td>\n<\/tr>\n
173<\/td>\n14.2 Description of Reinforced Concrete Pipe <\/td>\n<\/tr>\n
179<\/td>\n14.3 A Sample Project to Illustrate Actual Installation Work <\/td>\n<\/tr>\n
188<\/td>\n15 BAR-WRAPPED CONCRETE CYLINDER PIPE
15.1 General Background and Discussion <\/td>\n<\/tr>\n
189<\/td>\n15.2 Product Information <\/td>\n<\/tr>\n
193<\/td>\n15.3 Shipping and Handling <\/td>\n<\/tr>\n
194<\/td>\n15.4 Installation <\/td>\n<\/tr>\n
199<\/td>\n15.5 Testing and Acceptance <\/td>\n<\/tr>\n
200<\/td>\n15.6 Conditional Acceptance <\/td>\n<\/tr>\n
202<\/td>\n16 VITRIFIED CLAY PIPE
16.1 General Background and Discussion <\/td>\n<\/tr>\n
203<\/td>\n16.2 Shipping and Handling <\/td>\n<\/tr>\n
204<\/td>\n16.3 Installation <\/td>\n<\/tr>\n
209<\/td>\n16.4 Final Testing <\/td>\n<\/tr>\n
210<\/td>\n17 POLYVINYL CHLORIDE PIPE
17.1 General Background and Discussion <\/td>\n<\/tr>\n
212<\/td>\n17.2 Receiving, Storage, and Handling <\/td>\n<\/tr>\n
214<\/td>\n17.3 Installation <\/td>\n<\/tr>\n
221<\/td>\n17.4 Inspection and Testing <\/td>\n<\/tr>\n
226<\/td>\n18 POLYETHYLENE PIPE
18.1 General Background and Discussion <\/td>\n<\/tr>\n
232<\/td>\n18.2 Shipping and Handling Polyethylene Pipe <\/td>\n<\/tr>\n
234<\/td>\n18.3 Installation of Polyethylene Pipe <\/td>\n<\/tr>\n
243<\/td>\n18.4 Testing and Acceptance <\/td>\n<\/tr>\n
246<\/td>\n19 FIBERGLASS-REINFORCED (THERMOSETTING RESIN) PLASTIC PIPE
19.1 General Background <\/td>\n<\/tr>\n
247<\/td>\n19.2 Product Information <\/td>\n<\/tr>\n
249<\/td>\n19.3 Shipping and Handling Fiberglass Pipe <\/td>\n<\/tr>\n
251<\/td>\n19.4 Unloading and Handling Pipe <\/td>\n<\/tr>\n
252<\/td>\n19.5 Installation <\/td>\n<\/tr>\n
254<\/td>\n19.6 Joining <\/td>\n<\/tr>\n
255<\/td>\n19.7 Other Joining Methods <\/td>\n<\/tr>\n
256<\/td>\n19.8 Pipe Fittings
19.9 Pipe Placement and Assembly <\/td>\n<\/tr>\n
257<\/td>\n19.10 Tapping
19.11 Field Cutting of Fiberglass Pipe
19.12 Installation in Tunnels, Casings, and for Sliplining <\/td>\n<\/tr>\n
259<\/td>\n19.13 Pipe Jacking and Microtunneling <\/td>\n<\/tr>\n
260<\/td>\n19.14 Other Considerations during Pipe Laying
19.15 Use of Temporary Trench Shoring <\/td>\n<\/tr>\n
261<\/td>\n19.16 Trench Construction in Rock
19.17 Thrust Blocks, Concrete Encasement, Rigid Connections <\/td>\n<\/tr>\n
263<\/td>\n19.18 Valves <\/td>\n<\/tr>\n
264<\/td>\n19.19 Testing and Acceptance <\/td>\n<\/tr>\n
266<\/td>\nAPPENDIX A: EXCAVATOR\u2019S CHECKLIST <\/td>\n<\/tr>\n
270<\/td>\nAPPENDIX B: INDUSTRY ORGANIZATIONS <\/td>\n<\/tr>\n
276<\/td>\nAPPENDIX C: MODIFIED IOWA FORMULA <\/td>\n<\/tr>\n
278<\/td>\nINDEX
A
B <\/td>\n<\/tr>\n
279<\/td>\nC
D <\/td>\n<\/tr>\n
280<\/td>\nE
F
G <\/td>\n<\/tr>\n
281<\/td>\nH
I
J
K
L
M
N
O <\/td>\n<\/tr>\n
282<\/td>\nP <\/td>\n<\/tr>\n
283<\/td>\nR <\/td>\n<\/tr>\n
284<\/td>\nS <\/td>\n<\/tr>\n
285<\/td>\nT
U
V <\/td>\n<\/tr>\n
286<\/td>\nW <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Manual of Practice No. 117: Inspecting Pipeline Installation<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASCE<\/b><\/a><\/td>\n2009<\/td>\n286<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":28145,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2660],"product_tag":[],"class_list":{"0":"post-28144","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asce","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/28144","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/28145"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=28144"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=28144"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=28144"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}