{"id":29792,"date":"2024-10-17T03:21:42","date_gmt":"2024-10-17T03:21:42","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-ptc-29-05-2005\/"},"modified":"2024-10-24T14:14:49","modified_gmt":"2024-10-24T14:14:49","slug":"asme-ptc-29-05-2005","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-ptc-29-05-2005\/","title":{"rendered":"ASME PTC 29 05 2005"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
4<\/td>\nCONTENTS <\/td>\n<\/tr>\n
5<\/td>\nFigures
Tables <\/td>\n<\/tr>\n
6<\/td>\nNOTICE <\/td>\n<\/tr>\n
7<\/td>\nFOREWORD <\/td>\n<\/tr>\n
8<\/td>\nCOMMITTEE ROSTER <\/td>\n<\/tr>\n
10<\/td>\nCORRESPONDENCE WITH THE PTC 29 COMMITTEE <\/td>\n<\/tr>\n
11<\/td>\nINTRODUCTION <\/td>\n<\/tr>\n
12<\/td>\nSection 1 Object and Scope
1- 1 OBJECT
1- 2 SCOPE <\/td>\n<\/tr>\n
13<\/td>\n1- 3 TEST UNCERTAINTY
Section 2 Definitions and Descriptions of Terms
1-1 Allowable Test Uncertainties <\/td>\n<\/tr>\n
14<\/td>\n2-1 Definitions <\/td>\n<\/tr>\n
17<\/td>\n2-1 Damping Time Constant
2-2 Deadband
2-3 Deadtime
2-4 Derivative Gain <\/td>\n<\/tr>\n
18<\/td>\nSection 3 Guiding Principles
3- 1 INTRODUCTION
3- 2 PREPARATIONS FOR TESTING
2-5 Power Droop
2-6 Servomotor Time
2-7 Speed Droop <\/td>\n<\/tr>\n
19<\/td>\n3- 3 TESTS <\/td>\n<\/tr>\n
20<\/td>\n3- 4 INSTRUMENTS
3- 5 OPERATING
3- 6 RECORDS <\/td>\n<\/tr>\n
21<\/td>\nSection 4 Instruments and Methods of Measurement
4- 1 INSTRUMENT SPECIFICATIONS
4- 2 PERFORMANCE TESTS\u2014 ELECTRONIC GOVERNOR <\/td>\n<\/tr>\n
22<\/td>\n4-1 Temporary Droop
4-2 Speed Deadband <\/td>\n<\/tr>\n
23<\/td>\n4-3 Position Deadband
4-4 Position Deadtime <\/td>\n<\/tr>\n
25<\/td>\n4- 3 OPERATIONAL TESTS\u2014 ELECTRONIC GOVERNOR <\/td>\n<\/tr>\n
27<\/td>\n4- 4 PERFORMANCE TESTS\u2014 MECHANICAL GOVERNOR <\/td>\n<\/tr>\n
29<\/td>\n4- 5 OPERATIONAL TESTS\u2014 FULL RATE SERVOMOTOR TIME AND SERVOMOTOR CUSHION TIME FOR MECHANICAL GOVERNOR <\/td>\n<\/tr>\n
30<\/td>\nSection 5 Computation of Results
5- 1 DATA REDUCTION
5- 2 PERFORMANCE TEST RESULTS\u2014 ELECTRONIC GOVERNOR
5-1 Speed Deadband (Sample Test Plots) <\/td>\n<\/tr>\n
31<\/td>\n5-2 Speed Deadtime
5-3 Position Deadband (Sample Test Plots)
5-4 Position Deadtime (Sample Test Plots)
5-5 Power Deadband <\/td>\n<\/tr>\n
32<\/td>\n5-6 Steady-State Speed Band
5-7 Steady-State Power Band
5-8 Step Response <\/td>\n<\/tr>\n
33<\/td>\n5- 3 OPERATIONAL TEST RESULTS\u2014 ELECTRONIC GOVERNOR
5- 4 PERFORMANCE TEST RESULTS\u2014 MECHANICAL GOVERNOR
5-1 Permanent Droop <\/td>\n<\/tr>\n
34<\/td>\n5- 5 OPERATIONAL TEST RESULTS\u2014 MECHANICAL GOVERNOR
Section 6 Report of Results
6- 1 GENERAL REQUIREMENTS
6- 2 TEST REPORT FORM <\/td>\n<\/tr>\n
35<\/td>\n6- 3 UNCERTAINTY ANALYSIS
Section 7 Optional Tests
7- 1 OVERSPEED SIMULATION
7- 2 LOAD REJECTION TESTS\u2014 ON SITE <\/td>\n<\/tr>\n
36<\/td>\n7- 3 ACCUMULATOR CAPACITY
7- 4 ACCUMULATOR ACTIVE VOLUME
7- 5 OIL PUMP CAPACITY
7- 6 HYDRAULIC SYSTEM PRESSURE CONTROL RANGE
7- 7 STEADY- STATE OIL CONSUMPTION
7- 8 FREQUENCY RESPONSE TEST <\/td>\n<\/tr>\n
37<\/td>\n7-1 Frequency Response Test Setup
7-1 Customary Frequency Response Tests <\/td>\n<\/tr>\n
38<\/td>\n7-2 Frequency Response Inputs and Outputs
7-3 Frequency Response Diagram <\/td>\n<\/tr>\n
40<\/td>\nNONMANDATORY APPENDIX
A UNCERTAINTY ANALYSIS
A- 1 INTRODUCTION
A- 2 SAMPLE CALCULATION <\/td>\n<\/tr>\n
42<\/td>\nA- 3 CONCLUSION <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASME PTC 29 Speed-Governing Systems for Hydraulic Turbine-Generator Units <\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASME<\/b><\/a><\/td>\n2005<\/td>\n46<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":29793,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2643],"product_tag":[],"class_list":{"0":"post-29792","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asme","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/29792","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/29793"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=29792"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=29792"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=29792"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}