{"id":315296,"date":"2024-10-19T21:43:40","date_gmt":"2024-10-19T21:43:40","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-83112013\/"},"modified":"2024-10-25T19:51:56","modified_gmt":"2024-10-25T19:51:56","slug":"bs-en-iso-83112013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-83112013\/","title":{"rendered":"BS EN ISO 8311:2013"},"content":{"rendered":"
This International Standard specifies a method for the internal measurement of membrane tanks used in ships for the transport of refrigerated light hydrocarbon fluids. In addition to the actual process of measurement, it sets out the calculation procedures for compiling the tank capacity table and correction tables to be used for the computation of cargo quantities. This International Standard, with some modification, can also be applicable to the calibration of independent prismatic tanks.<\/p>\n
For the manual measurement of membrane tanks, the procedures of this International Standard utilize the scaffolding used for the installation of the membranes to support the measuring equipment but, for the internal electro-optical distance-ranging (EODR) method, other safe means of access to the required measuring positions are intended to be used.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Section sec_1 Section sec_2 Section sec_3 Section sec_3.1 Section sec_3.2 1\tScope 2\tNormative references 3\tTerms and definitions <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Section sec_3.3 Section sec_3.4 Section sec_3.5 Section sec_3.6 Section sec_3.7 Section sec_3.8 Section sec_3.9 Section sec_3.10 Section sec_3.11 Section sec_3.12 Section sec_3.13 Section sec_3.14 Section sec_3.15 <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Section sec_3.16 Section sec_3.17 Section sec_3.18 Section sec_3.19 Section sec_3.20 Section sec_3.21 Section sec_4 Section sec_4.1 Section sec_4.2 Section sec_4.3 4\tPrecautions 4.1\tGeneral 4.2\tShip\u2019s condition during calibration 4.3\tTank distortion <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Section sec_4.4 Section sec_4.5 Section sec_4.6 4.4\tComparison with drawings 4.5\tMeasurements by measuring tape 4.6\tMeasurements by electro-optical distance-ranging (EODR) instrument <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Section sec_4.7 Section sec_4.8 Section sec_5 Section sec_5.1 Section sec_5.2 Section sec_5.3 Section sec_5.4 4.7\tCondition of membrane 4.8\tSafety precautions for work in membrane tanks 5\tEquipment <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Section sec_5.5 Section sec_5.6 Section sec_6 Section sec_7 Section sec_7.1 6\tDetermination of measuring points 7\tCalibration by manual method 7.1\tGeneral <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Section sec_7.2 Section sec_7.2.1 Section sec_7.2.2 Section sec_7.2.3 7.2\tTank length measurement <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Table tab_d Figure fig_1 <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Section sec_7.2.4 Section sec_7.3 Section sec_7.3.1 Section sec_7.3.2 Section sec_7.3.3 7.3\tTank width measurement <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Table tab_g Figure fig_2 Section sec_7.3.4 <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Table tab_h Figure fig_3 <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Table tab_i Figure fig_4 Section sec_7.4 Section sec_7.4.1 7.4\tTank height measurement <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Section sec_7.4.2 Section sec_7.4.3 Section sec_7.4.4 <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Table tab_m Figure fig_5 Section sec_7.5 Section sec_7.5.1 Section sec_7.5.2 Section sec_7.5.3 Section sec_7.5.4 7.5\tMeasurement of bottom undulation and gauge reference height <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | Section sec_7.5.5 Table tab_n Figure fig_6 Section sec_7.6 7.6\tCorrection for temperature <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Section sec_8 Section sec_8.1 Section sec_8.2 8\tCalibration by electro-optical distance-ranging (EODR) method 8.1\tGeneral 8.2\tSetting up of EODR instrument <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Section sec_8.3 Section sec_8.3.1 Table tab_p Figure fig_7 8.3\tCalibration procedure <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Section sec_8.3.2 Section sec_8.3.3 Section sec_8.3.4 <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Section sec_9 Section sec_9.1 Section sec_9.2 Section sec_9.2.1 Section sec_9.2.2 Section sec_9.2.3 Section sec_9.2.4 Section sec_10 Section sec_10.1 9\tAdditional measurements 9.1\tLocation of level gauge 9.2\tDeadwood 10\tCalculation 10.1\tGeneral <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Figure fig_8 Section sec_10.2 Section sec_10.3 Section sec_10.4 Section sec_10.4.1 10.2\tCalculation of tank volume 10.3\tEffect of bottom undulation 10.4\tArea of chamfer portion <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Section sec_10.4.2 Section sec_10.4.3 Section sec_10.5 Section sec_10.6 Section sec_10.7 Section sec_10.8 10.5\tTrim corrections 10.6\tList corrections 10.7\tCombined trim and list corrections 10.8\tCorrection for tank shell expansion or contraction <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Section sec_11 11\tReport and tables <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Section sec_12 12\tRecalibration <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Annex sec_A Annex sec_A.1 Annex sec_A.2 Annex\u00a0A \n(informative)<\/p>\n Uncertainty associated with tank calibration <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Annex sec_A.3 Annex sec_A.4 Figure fig_A.1 <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Annex sec_A.5 Annex sec_A.6 Annex sec_A.7 Annex sec_A.7.1 <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Annex sec_A.7.2 Annex sec_A.7.2.1 Annex sec_A.7.2.2 Annex sec_A.7.2.3 <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Annex sec_A.7.3 Annex sec_A.7.3.1 Annex sec_A.7.3.2 Annex sec_A.7.3.3 Annex sec_A.7.4 <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Annex sec_A.7.5 Annex sec_A.7.5.1 Annex sec_A.7.5.2 Annex sec_A.7.5.3 Annex sec_A.7.6 Table tab_A.1 Annex sec_A.7.7 Annex sec_A.7.7.1 <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Annex sec_A.7.7.2 Annex sec_A.7.7.3 Annex sec_A.7.7.4 Annex sec_A.7.7.5 Annex sec_A.7.7.6 Annex sec_A.7.7.7 <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Annex sec_A.7.8 Annex sec_A.7.8.1 Annex sec_A.7.8.2 Annex sec_A.7.8.3 Annex sec_A.7.8.4 Annex sec_A.7.8.5 Annex sec_A.7.8.6 Annex sec_A.8 <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Table tab_A.2 Table tab_A.3 <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | Table tab_A.4 <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Table tab_A.5 Table tab_A.6 Annex sec_A.9 <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Annex sec_B Annex\u00a0B \n(informative)<\/p>\n Example of tank capacity table (Tank No.3) <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Annex sec_C Annex\u00a0C \n(informative)<\/p>\n Example of trim correction table (Tank No. 1) Example of trim correction table (Tank No. 1) <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Annex sec_D Annex\u00a0D \n(informative)<\/p>\n Example of list correction table (Tank No.\u00a01) Example of list correction table (Tank No.\u00a01) <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Reference ref_1 Reference ref_2 Reference ref_3 Reference ref_4 Reference ref_5 Reference ref_6 Reference ref_7 Reference ref_8 Reference ref_9 Bibliography Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Refrigerated hydrocarbon and non-petroleum based liquefied gaseous fuels. Calibration of membrane tanks and independent prismatic tanks in ships. Manual and internal electro-optical distance-ranging methods<\/b><\/p>\n |