{"id":335485,"date":"2024-10-19T23:25:13","date_gmt":"2024-10-19T23:25:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-16601-10-012014\/"},"modified":"2024-10-25T22:22:58","modified_gmt":"2024-10-25T22:22:58","slug":"bs-en-16601-10-012014","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-16601-10-012014\/","title":{"rendered":"BS EN 16601-10-01:2014"},"content":{"rendered":"

This Standard provides means for identifying and structuring all of the activities and information required in a project review. It identifies the information outputs and activities necessary to complete the process. It also provides a check\u2013list of activities and information required for each of the project reviews identified in the ECSS Management Standards.<\/p>\n

This standard may be tailored for the specific characteristics and constraints of a space project, in conformance with ECSS-S-ST-00.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
7<\/td>\n1 Scope <\/td>\n<\/tr>\n
8<\/td>\n2 Normative references <\/td>\n<\/tr>\n
9<\/td>\n3 Terms, definitions and abbreviated terms
3.1 Terms from other standards
3.2 Terms specific to the present standard <\/td>\n<\/tr>\n
10<\/td>\n3.3 Abbreviated terms <\/td>\n<\/tr>\n
11<\/td>\n4 Fundamentals of reviews
4.1 Basic principles
4.2 Review tasks
4.2.1 Initiation of the review
4.2.2 Preparation and distribution of the review data-package <\/td>\n<\/tr>\n
12<\/td>\n4.2.3 Review of the documentation
4.2.4 Review findings and conclusions <\/td>\n<\/tr>\n
13<\/td>\n5 Requirements
5.1 General
5.2 Review bodies <\/td>\n<\/tr>\n
14<\/td>\n5.3 Roles and tasks
5.3.1 Review authority
5.3.2 Customer <\/td>\n<\/tr>\n
15<\/td>\n5.3.3 Supplier
5.3.4 Review team leader
5.3.5 Review team
5.4 Prerequisite conditions for holding the review <\/td>\n<\/tr>\n
16<\/td>\n5.5 Review meetings
5.5.1 Prerequisite key point
5.5.2 Kick-off meeting
5.5.3 Coordination meeting
5.5.4 Collocation meeting
5.5.5 Review team close-out meeting <\/td>\n<\/tr>\n
17<\/td>\n5.5.6 Review authority meeting
5.6 RID processing and action item follow-up <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Space project management – Organization and conduct of reviews<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2014<\/td>\n30<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":335494,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-335485","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/335485","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/335494"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=335485"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=335485"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=335485"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}