{"id":346371,"date":"2024-10-20T00:20:50","date_gmt":"2024-10-20T00:20:50","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iso-iec-tr-144712007\/"},"modified":"2024-10-25T23:47:57","modified_gmt":"2024-10-25T23:47:57","slug":"bsi-pd-iso-iec-tr-144712007","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iso-iec-tr-144712007\/","title":{"rendered":"BSI PD ISO\/IEC TR 14471:2007"},"content":{"rendered":"
Since CASE adoption is a subject of the broader technology transition problem, this Technical Report addresses the adoption practices appropriate for a wide range of computing organisations. This Technical Report neither dictates nor advocates particular development standards, software processes, design methods, methodologies, techniques, programming languages, or life-cycle paradigms.<\/p>\n
This Technical Report will:<\/p>\n
identify critical success factors (CSF);<\/p>\n<\/li>\n
propose a set of adoption processes;<\/p>\n<\/li>\n
guide successful adoption in consideration of organisational and cultural environment.<\/p>\n<\/li>\n<\/ul>\n
The following groups are targeted as potential audiences:<\/p>\n
CASE users;<\/p>\n<\/li>\n
information systems managers;<\/p>\n<\/li>\n
chief information officers (CIO);<\/p>\n<\/li>\n
CASE suppliers;<\/p>\n<\/li>\n
software engineering consultants;<\/p>\n<\/li>\n
those involved in the acquisition of CASE tools and technology.<\/p>\n<\/li>\n<\/ul>\n
Therefore this Technical Report addresses aspects of CASE tools adoption. It is best used with ISO\/IEC 14102 for CASE tool evaluation and selection. It is complementary to related ISO\/IEC documents which deal with the general aspects of these topics.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
9<\/td>\n | Scope <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Terms, definitions and abbreviations Terms and definitions Abbreviations Critical success factors (CSF) for adoption <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Overview of CASE adoption <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Preparation process <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Evaluation and selection process Pilot project process Transition process <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Preparation process <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Setting goals <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Verifying feasibility and measurability Setting policy Developing a plan <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Evaluation and selection process <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Pilot project process <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Pilot initiation <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Pilot performance Pilot evaluation <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Decision for a next step <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Transition process <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | Initiation for transition <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Training Transition to routine use Institutionalisation <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Monitoring and continuous support Evaluation of adoption project and completion <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Information technology. Software engineering. Guidelines for the adoption of CASE tools<\/b><\/p>\n |