{"id":431258,"date":"2024-10-20T07:27:13","date_gmt":"2024-10-20T07:27:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-23-30470408-dc-2023\/"},"modified":"2024-10-26T14:10:08","modified_gmt":"2024-10-26T14:10:08","slug":"bsi-23-30470408-dc-2023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-23-30470408-dc-2023\/","title":{"rendered":"BSI 23\/30470408 DC 2023"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
8<\/td>\nForeword <\/td>\n<\/tr>\n
9<\/td>\nIntroduction <\/td>\n<\/tr>\n
11<\/td>\n1 Scope
2 Normative references <\/td>\n<\/tr>\n
12<\/td>\n3 Terms and definitions
4 Abbreviated terms <\/td>\n<\/tr>\n
13<\/td>\n5 Project management specification and plan
5.1 General
5.2 Project management specification <\/td>\n<\/tr>\n
14<\/td>\n5.3 Project management plan <\/td>\n<\/tr>\n
15<\/td>\n6 Work breakdown structure
6.1 General
6.2 Objectives
6.3 Responsibility and authority for development
6.4 Rules for defining the WBS
6.4.1 Main aspects <\/td>\n<\/tr>\n
16<\/td>\n6.4.2 Function tree
6.4.3 Product tree
6.4.4 Tasks <\/td>\n<\/tr>\n
17<\/td>\n6.5 Management rules for changes
7 Project organization
7.1 General
7.2 Principles <\/td>\n<\/tr>\n
18<\/td>\n7.3 Organizational requirements
7.3.1 General
7.3.2 Requirements
7.4 Information and communication
7.4.1 Information circuits <\/td>\n<\/tr>\n
19<\/td>\n7.4.2 Communication requirements
7.4.3 Protection of information
7.4.4 Progress reports
7.4.5 Customer’s prerogatives <\/td>\n<\/tr>\n
20<\/td>\n7.4.6 Action items management
7.4.7 Technical and management indicators
8 Project phasing and planning
8.1 General
8.2 Project phasing
8.2.1 Principles <\/td>\n<\/tr>\n
21<\/td>\n8.2.2 Mission analysis phase (phase\u20ac0 or pre-phase\u20acA)
8.2.3 Feasibility phase (phase\u20acA) <\/td>\n<\/tr>\n
22<\/td>\n8.2.4 Definition phase (phase\u20acB) <\/td>\n<\/tr>\n
23<\/td>\n8.2.5 Development (phase\u20acC) and production (phase\u20acD) phases <\/td>\n<\/tr>\n
25<\/td>\n8.2.6 Utilization phase (phase\u20acE)
8.2.7 Disposal phase (phase\u20acF)
8.3 Product stages\u20ac\u2014 Associated processes and documents
8.3.1 General
8.3.2 Functional stage <\/td>\n<\/tr>\n
26<\/td>\n8.3.3 Specified stage <\/td>\n<\/tr>\n
27<\/td>\n8.3.4 Designed stage <\/td>\n<\/tr>\n
29<\/td>\n8.3.5 As-built stage
8.3.6 Use stage
9 Cost and schedule management
9.1 General <\/td>\n<\/tr>\n
30<\/td>\n9.2 Cost management
9.2.1 Principles
9.2.2 Optimization
9.2.3 Cost estimates
9.2.4 Cost monitoring <\/td>\n<\/tr>\n
31<\/td>\n9.3 Schedule management
9.3.1 Principles
9.3.2 Task sequencing <\/td>\n<\/tr>\n
32<\/td>\n9.3.3 Deviation analysis \u2014 Trend analysis <\/td>\n<\/tr>\n
33<\/td>\n9.4 Evaluation after completion
10 Configuration management
10.1 General
10.2 Configuration management planning
10.3 Configuration identification
10.3.1 Product tree and selection of configuration items
10.3.2 Documentation of configuration items
10.3.3 Establishment of configuration baselines <\/td>\n<\/tr>\n
34<\/td>\n10.4 Configuration status accounting
10.5 Configuration control
10.5.1 General
10.5.2 Configuration baselines
10.5.3 Configuration control board
10.6 Change control
10.6.1 Change classification
10.6.2 Change approval <\/td>\n<\/tr>\n
35<\/td>\n10.7 Configuration status controlling
10.8 Configuration audit
11 Integrated logistics support
11.1 Objectives
11.2 Scheduling aspects <\/td>\n<\/tr>\n
36<\/td>\n11.3 ILS management
11.3.1 ILS integration into the project
11.3.2 Communication
11.3.3 Design, development and maintenance of support elements
11.3.4 Follow-up of the system in service
11.3.5 ILS organization <\/td>\n<\/tr>\n
37<\/td>\n12 Documentation and information management
12.1 Objective
12.2 Application conditions
12.3 List of documents to be produced
12.4 List of applicable and reference documents
12.5 Master list of documents <\/td>\n<\/tr>\n
38<\/td>\n12.6 Document identification
12.7 Drafting of documents <\/td>\n<\/tr>\n
39<\/td>\n12.8 Document authorization
12.8.1 General rules
12.8.2 Submission phases
12.8.3 Document changes
12.9 Availability of documentation
12.9.1 General <\/td>\n<\/tr>\n
40<\/td>\n12.9.2 Classification, filing and storage
12.9.3 Confidentiality
13 Risk management
13.1 General <\/td>\n<\/tr>\n
42<\/td>\n13.2 Critical items control
14 Project closure
14.1 General <\/td>\n<\/tr>\n
43<\/td>\n14.2 Scheduled project closure
14.3 Unscheduled closure of the project <\/td>\n<\/tr>\n
44<\/td>\nAnnex\u20acA (informative) Management framework for space systems standards <\/td>\n<\/tr>\n
45<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

BS ISO 14300-1. Space systems. Programme management – Part 1. Structuring of a project<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2023<\/td>\n45<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":431268,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-431258","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/431258","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/431268"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=431258"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=431258"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=431258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}