{"id":445617,"date":"2024-10-20T08:42:42","date_gmt":"2024-10-20T08:42:42","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iso-tr-59112023\/"},"modified":"2024-10-26T16:13:08","modified_gmt":"2024-10-26T16:13:08","slug":"bsi-pd-iso-tr-59112023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iso-tr-59112023\/","title":{"rendered":"BSI PD ISO\/TR 5911:2023"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4 General aspects 4.1 Benefits of commissioning for lighting systems 4.2 The need for commissioning 4.3 Content of commissioning for lighting systems <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4.4 The acceptance of commissioning deliverables 5 Commissioning methods and selection 5.1 Classification of commissioning methods <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 5.2 Selection of commissioning methods 6 Roles and responsibilities 6.1 General <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 6.2 Owner or tenant 6.3 Design team 6.4 Contractors, subcontractors and suppliers <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 6.5 Commissioning team 7 Commissioning activities 7.1 General <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 7.2 Pre-commissioning phase 7.3 Installation phase <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 7.4 Field commissioning phase <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 7.5 Post occupancy phase <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 8 Documentation requirements of ISO\/TS 21274 8.1 General 8.2 Commissioning plan <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 8.3 Commissioning specification 8.4 Commissioning observation inspection and calibration report <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 8.5 Issues log 8.6 Training plan <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 8.7 Commissioning report 9 Contractual completion <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Annex A (informative) Example for commissioning specification of lighting systems <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Light and lighting. Commissioning of lighting systems in buildings. Explanation and justification of ISO\/TS 21274<\/b><\/p>\n |