{"id":457692,"date":"2024-10-20T09:52:45","date_gmt":"2024-10-20T09:52:45","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-16311-42024\/"},"modified":"2024-10-26T18:21:29","modified_gmt":"2024-10-26T18:21:29","slug":"bs-iso-16311-42024","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-16311-42024\/","title":{"rendered":"BS ISO 16311-4:2024"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4 Structural stability during execution of repairs 5 General requirements <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 6 Methods of repair <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 7 Preparation of substrate 7.1 General <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 7.2 Preparation of concrete 7.2.1 General 7.2.2 Cleaning 7.2.3 Roughening 7.2.4 Concrete removal <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 7.3 Preparation of reinforcement 7.3.1 General 7.3.2 Cleaning 8 Application of products and systems 8.1 General <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 8.2 Structural strengthening to restore member capacity \u2014 methods 8.2.1 Bonding 8.2.2 Hand applied mortar and concrete 8.2.3 Sprayed repair mortar or concrete 8.2.4 Cast repair mortar or concrete <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 8.2.5 Curing 8.2.6 Cracks and joints 8.2.7 Surface coatings and other treatments <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 8.2.8 Anchoring 8.2.9 Plate bonding and fibre-reinforced polymer (FRP) strengthening 8.3 Defects caused by reinforcement corrosion 8.3.1 Coating reinforcement 8.3.2 Removal 8.3.3 Replacement <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 9 Quality control 9.1 General 9.2 Quality control tests and observations 10 Maintenance following completion of remedial action <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 11 Health, safety and the environment <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Annex A (informative) Commentary on the execution of repairs <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Maintenance and repair of concrete structures – Execution of repairs<\/b><\/p>\n |