{"id":79013,"date":"2024-10-17T18:28:06","date_gmt":"2024-10-17T18:28:06","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asce-9780784410615-2010\/"},"modified":"2024-10-24T19:38:49","modified_gmt":"2024-10-24T19:38:49","slug":"asce-9780784410615-2010","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asce\/asce-9780784410615-2010\/","title":{"rendered":"ASCE 9780784410615 2010"},"content":{"rendered":"

TCLEE Monograph 32 discusses in detail the performance of lifeline infrastructure systems during and after the August 15, 2007, Pisco, Peru, earthquake.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
14<\/td>\nTable of Contents <\/td>\n<\/tr>\n
20<\/td>\nChapter 1: Introduction
Executive Summary <\/td>\n<\/tr>\n
22<\/td>\nPower Systems
Communications
Water and Wastewater Systems <\/td>\n<\/tr>\n
23<\/td>\nHighways and Bridges
Sea Ports and Airports
Emergency Power
Gas and Tanks <\/td>\n<\/tr>\n
24<\/td>\nHospitals, Schools, and Churches
Emergency Response, Recovery, and Social Impact <\/td>\n<\/tr>\n
25<\/td>\nOrganization <\/td>\n<\/tr>\n
26<\/td>\nChapter 2: Geotechnical Aspects
Tectonic Setting and Seismicity <\/td>\n<\/tr>\n
27<\/td>\nGround Motions <\/td>\n<\/tr>\n
30<\/td>\nGeographic and Geologic Setting <\/td>\n<\/tr>\n
31<\/td>\nGeotechnical Observations
Liquefaction <\/td>\n<\/tr>\n
34<\/td>\nLiquefaction at Bridges
Lateral Spreading Along Pan-American Highway <\/td>\n<\/tr>\n
37<\/td>\nRock Slides <\/td>\n<\/tr>\n
38<\/td>\nTsunami <\/td>\n<\/tr>\n
39<\/td>\nAcknowledgments
References <\/td>\n<\/tr>\n
40<\/td>\nChapter 3: Performance of Bridges and Highways
Overview of Damage <\/td>\n<\/tr>\n
41<\/td>\nDescription of the Highway System <\/td>\n<\/tr>\n
43<\/td>\nBridges Seismic Design Criteria <\/td>\n<\/tr>\n
46<\/td>\nSummary of Highway Damage <\/td>\n<\/tr>\n
47<\/td>\nPan-American Highway South <\/td>\n<\/tr>\n
52<\/td>\nDepartmental Highway No. 100 Chincha-Huancos <\/td>\n<\/tr>\n
56<\/td>\nDepartmental Highway Route 110 Los Molinos-Tambillo <\/td>\n<\/tr>\n
59<\/td>\nDepartmental Highway Route 24\u2014Los Libertadores <\/td>\n<\/tr>\n
60<\/td>\nOther Bridges
Bridges Inspected in the City of Ica <\/td>\n<\/tr>\n
61<\/td>\nTambo de Mora and Sunampe <\/td>\n<\/tr>\n
62<\/td>\nEmergency Response <\/td>\n<\/tr>\n
63<\/td>\nMajor Observations and Recommendations <\/td>\n<\/tr>\n
64<\/td>\nAcknowledgment <\/td>\n<\/tr>\n
66<\/td>\nChapter 4: Electric Power
Executive Summary <\/td>\n<\/tr>\n
68<\/td>\nSystem Description <\/td>\n<\/tr>\n
69<\/td>\nOverview of System Performance <\/td>\n<\/tr>\n
70<\/td>\nObserved Damage <\/td>\n<\/tr>\n
79<\/td>\nEmergency Response
Major Observations and Recommendations
Acknowledgements <\/td>\n<\/tr>\n
80<\/td>\nChapter 5: Water
Executive Summary
Description of Pisco Water System <\/td>\n<\/tr>\n
82<\/td>\nOverview of Pisco Water System Performance <\/td>\n<\/tr>\n
84<\/td>\nDamage to Pisco Infiltration Gallery and Transmission Pipeline <\/td>\n<\/tr>\n
85<\/td>\nDamage to Pisco Water Reservoirs <\/td>\n<\/tr>\n
87<\/td>\nDamage to Pisco Water Distribution
Description of the Ica Water System <\/td>\n<\/tr>\n
88<\/td>\nOverview of Ica Water System Performance <\/td>\n<\/tr>\n
89<\/td>\nDamage to Ica Water Reservoirs <\/td>\n<\/tr>\n
92<\/td>\nMajor Observations and Recommendations <\/td>\n<\/tr>\n
93<\/td>\nAcknowledgements <\/td>\n<\/tr>\n
94<\/td>\nChapter 6: Wastewater
Executive Summary
Description of Pisco Wastewater System <\/td>\n<\/tr>\n
95<\/td>\nOverview of Pisco Wastewater System Performance
Pump Station Damage <\/td>\n<\/tr>\n
96<\/td>\nDamage to the Pisco Sewage Collection System <\/td>\n<\/tr>\n
98<\/td>\nDescription of the Ica Wastewater System
Overview of Ica Wastewater System Performance <\/td>\n<\/tr>\n
99<\/td>\nMajor Observations and Recommendations <\/td>\n<\/tr>\n
100<\/td>\nAcknowledgements <\/td>\n<\/tr>\n
101<\/td>\nChapter 7: Telecommunications
Executive Summary <\/td>\n<\/tr>\n
104<\/td>\nDescription of System <\/td>\n<\/tr>\n
106<\/td>\nOverview of System Performance
Trunk Lines Crossing Huanami Bridge (S13.6877, W76.1581) <\/td>\n<\/tr>\n
110<\/td>\nNextel Cell Sites (S13.4143, W76.1877 and S13.7089, W76.2028) <\/td>\n<\/tr>\n
114<\/td>\nTelef\u00f3nica, Pisco, Central Office and Cell Site (S13.7092, W76.2054) <\/td>\n<\/tr>\n
119<\/td>\nClaro, Pisco, Cell Site (S13.7103, W76.2045) <\/td>\n<\/tr>\n
121<\/td>\nTelef\u00f3nica, Ica City, Central Office and Cell Site (S14.0666, W75.7289) <\/td>\n<\/tr>\n
122<\/td>\nCell Sites Near Paracas (S13.8214, W76.2443) <\/td>\n<\/tr>\n
124<\/td>\nTelef\u00f3nica Cell Site Outside of Ica City <\/td>\n<\/tr>\n
127<\/td>\nMajor Observations and Recommendations <\/td>\n<\/tr>\n
129<\/td>\nAcknowledgements <\/td>\n<\/tr>\n
130<\/td>\nChapter 8: Airport
Executive Summary
Description of Jorge Chavez International Airport (S120 01′ 19″, W770 6′ 52″) <\/td>\n<\/tr>\n
133<\/td>\nOverview of Performance <\/td>\n<\/tr>\n
134<\/td>\nMajor Observations and Recommendations <\/td>\n<\/tr>\n
135<\/td>\nAcknowledgements <\/td>\n<\/tr>\n
136<\/td>\nChapter 9: Ports
Introduction
Performance of Puerto San Martin (S13.8051, W76.2927) <\/td>\n<\/tr>\n
143<\/td>\nMajor Observations and Recommendations <\/td>\n<\/tr>\n
144<\/td>\nAcknowledgements <\/td>\n<\/tr>\n
145<\/td>\nChapter 10: Tanks\u2014Fish Oil and Liquid Fuel
Introduction <\/td>\n<\/tr>\n
146<\/td>\nFish Oil Tank Farm (S13.7760, W76.23760) <\/td>\n<\/tr>\n
149<\/td>\nConsorcio Terminales (S13.74740, W76.22730) <\/td>\n<\/tr>\n
152<\/td>\nPisco Refinery (S13.77270, W76.22980) <\/td>\n<\/tr>\n
154<\/td>\nMajor Observations and Recommendations
Acknowledgements <\/td>\n<\/tr>\n
155<\/td>\nChapter 11: Buildings: Houses, Schools, Hotels, and Churches
Executive Summary
Overview of Performance
Structural Building Material and Systems <\/td>\n<\/tr>\n
159<\/td>\nBuilding Codes <\/td>\n<\/tr>\n
161<\/td>\nResidential Buildings
Housing Building Material Statistics <\/td>\n<\/tr>\n
163<\/td>\nHousing Damage Statistics
Housing Damage Details\u2014Houses, One- and Two-Story <\/td>\n<\/tr>\n
166<\/td>\nHousing Damage Details\u2014Apartment Buildings, Three (or More) Stories <\/td>\n<\/tr>\n
168<\/td>\nEducational Buildings
Universidad Nacional “San Luis Gonzaga” de Ica (14.0906°S, 75.7334°W) <\/td>\n<\/tr>\n
169<\/td>\nMain campus, Ica (14.0906°S, 75.7334°W) <\/td>\n<\/tr>\n
173<\/td>\nMedical School Campus, Ica (14.0737°S, 75.7419°W)
Dental School Clinic, Local Central, Ica (14.065°S, 75.732°W) <\/td>\n<\/tr>\n
176<\/td>\nFisheries and Foods Campus, Pisco Playa (13.7101°S, 76.2184°W) <\/td>\n<\/tr>\n
177<\/td>\nPre-College Educational Buildings
San Juan Bautista High School, Huaytara <\/td>\n<\/tr>\n
178<\/td>\nBeatita de Humay Elementary and High School, Humay
San Luis Gonzaga High School, Ica <\/td>\n<\/tr>\n
180<\/td>\nLos Molinos Elementary School, Ica
Hotels <\/td>\n<\/tr>\n
181<\/td>\nChurches <\/td>\n<\/tr>\n
182<\/td>\nMitigation Initiatives
Retrofitting of Existing Adobe Houses
Evaluation of Seismic Performance of Retrofitted Houses (S 13°59.179′ W 75°46.458′) <\/td>\n<\/tr>\n
186<\/td>\nConstruction of New Earthquake Resistant Adobe Homes <\/td>\n<\/tr>\n
188<\/td>\nEvaluation of the Seismic Performance of Reinforced Houses (S 12°51.72′ W 76°03.27′) <\/td>\n<\/tr>\n
190<\/td>\nFinal Remarks <\/td>\n<\/tr>\n
191<\/td>\nAcknowledgements <\/td>\n<\/tr>\n
193<\/td>\nChapter 12: Hospitals and Medical Services
Executive Summary
Description of System
Overview of System Performance <\/td>\n<\/tr>\n
198<\/td>\nElectrical Power Systems: Commercial and Emergency
Automatic Transfer Switches
Emergency Power Generators\u2014Stationary Generators, Fuel Pumps, Fuel Tanks <\/td>\n<\/tr>\n
199<\/td>\nEmergency Power Generators\u2014Portable Generators
Water Supply Systems <\/td>\n<\/tr>\n
202<\/td>\nWastewater Systems
Communication Systems: External and Internal
Heating, Ventilating, and Air Conditioning Systems <\/td>\n<\/tr>\n
203<\/td>\nNatural Gas Systems <\/td>\n<\/tr>\n
204<\/td>\nPatient Transportation Systems
Medical Gas Systems
Critical Equipment <\/td>\n<\/tr>\n
205<\/td>\nFire Suppression Systems
Hazardous Material
Security Systems <\/td>\n<\/tr>\n
206<\/td>\nEmergency Preparedness, Response, and Recovery <\/td>\n<\/tr>\n
210<\/td>\nConclusions, Observations and Recommendations
Acknowledgements <\/td>\n<\/tr>\n
211<\/td>\nChapter 13: Emergency Response, Recovery and Social Impact
Introduction <\/td>\n<\/tr>\n
217<\/td>\nLocal and International Support <\/td>\n<\/tr>\n
220<\/td>\nEmergency Shelters <\/td>\n<\/tr>\n
221<\/td>\nHealth Impact
Observations <\/td>\n<\/tr>\n
222<\/td>\nAcknowledgement <\/td>\n<\/tr>\n
224<\/td>\nIndex
A
B <\/td>\n<\/tr>\n
225<\/td>\nC <\/td>\n<\/tr>\n
226<\/td>\nD
E <\/td>\n<\/tr>\n
227<\/td>\nF
G
H <\/td>\n<\/tr>\n
228<\/td>\nI
J
L <\/td>\n<\/tr>\n
229<\/td>\nM
N
O <\/td>\n<\/tr>\n
230<\/td>\nP <\/td>\n<\/tr>\n
231<\/td>\nQ
R
S <\/td>\n<\/tr>\n
232<\/td>\nT <\/td>\n<\/tr>\n
233<\/td>\nU
V
W
Y <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Pisco, Peru, Earthquake of August 15, 2007<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASCE<\/b><\/a><\/td>\n2010<\/td>\n233<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":79014,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2660],"product_tag":[],"class_list":{"0":"post-79013","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asce","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/79013","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/79014"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=79013"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=79013"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=79013"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}